Recent Searches

You haven't searched anything yet.

1 Master scheduler Job in Wellington, KS

SET JOB ALERT
Details...
GKN Aerospace
Wellington, KS | Full Time
$69k-90k (estimate)
2 Weeks Ago
Master scheduler
GKN Aerospace Wellington, KS
$69k-90k (estimate)
Full Time | Durable Manufacturing 2 Weeks Ago
Save

GKN Aerospace is Hiring a Master scheduler Near Wellington, KS

Fantastic challenges. Amazing opportunities.

GKN Aerospace is reimagining air travel : going further, faster and greener! Fuelled by great people whose expertise and creativity sets the standards in our industry, we’re inspired by the opportunities to innovate and break boundaries.

We’re proud to play a part in protecting the world’s democracies. And we’re committed to putting sustainability at the centre of everything we do, opening up and protecting our planet.

With over 16,000 employees across 33 manufacturing sites in 12 countries we serve over 90% of the world’s aircraft and engine manufacturers and achieved sales of £3.

35 bn.in 2023. There are no limits to where you can take your career.

Job Summary

Responsible for the management of the weekly MPS in order to balance demand and supply within available capacity and set Inventory targets.

Orchestrate the cross-functional MPS activities following the GKN Aerospace standard. Depending on the size of the site, own or support the monthly Operations Supply Planning (IBP) activities.

Job Responsibilities

  • Orchestrate Scheduling (MPS) activities beyond the current week time horizon and for the whole MPS horizon.
  • Create and maintain schedules to deliver in line with Programme requirements while maintaining Inventory targets and optimizing site capacity.
  • Schedule production for specified products and production lines understanding all the physical and manning constraints.
  • Ensure that MPS :
  • Is feasible and balanced against resource / demonstrated capacity,
  • Includes all phase-in / out, localization and transfer plans as well as new programme development / prototyping,
  • Is based on agreed working calendar and includes all planned downtime (Holiday, routine maintenance, Line closures, etc.),
  • Is in line with Supplier / Subcontractor available capacity,
  • Production Past Dues are re-scheduled weekly
  • Provide input for Material Requirement Planning / Vendor Scheduling process,
  • Proactively communicate / escalate to the management team potential MPS issues / constraints to trigger preventive actions in order to mitigate supply failure risk,
  • Support operations in monitoring manufacturing output / performance against the schedule / plan, challenging and understanding whenever performance differs from standard,
  • Support Programme Management in analyzing Inventory levels in order to optimize / challenge current status and search for improvement opportunities,
  • Provide communication / feedback to Programmes in case of any potential supply issues and also in order to improve Forecast accuracy,
  • Liaise with Programmes to support and coordinate all production schedules related new programme launch / prototyping activities,
  • Ensure relevant KPIs are monitored and PDCA approach applied with A3 in case of deviation to ensure targets are delivered in a sustainable way (e.

g. : Master Schedule Adherence, Customer Past Dues, Days Inventory Outstanding),

  • Depending on the size of the site, all of the above activities are also performed at Operations Supply Planning level and covering the 36 months horizon.
  • Support continuous improvement projects / activities,
  • Support Operations in the analysis of Master Schedule Adherence,
  • Ensure system Master Data is up to date for all planning and scheduling purposes
  • Related APQC items :
  • Accountable for the process Schedule Production in site scope.
  • Responsible, in site scope, for the Planning processes and the coordination of stakeholders / functions involved in the following : Plan for and align supply chain resources, Plan production operations, Schedule production, Schedule production operations.

Job Qualifications

Required Qualifications :

  • Bachelor of Science in Supply Chain OR- in lieu of degree, 2 years of experience with scheduling and / or production planning in a manufacturing environment.
  • Must be able to perform work subject to ITAR / EAR regulations and / or program requirements.

Preferred Qualifications :

  • GKN Experience
  • High Proficient with MS Excel
  • APICS CPIM Part1
  • We’ll offer you fantastic challenges and amazing opportunities. This is your chance to be part of an organisation that has proven itself to be at the cutting edge of our industry;

and is committed to pushing the boundaries even further. And with some of the best training on offer in the industry, who knows how far you can go?

A Great Place to work needs a Great Way of Working

Everyone is welcome to apply to GKN. We believe that we can only achieve our ambitions through a coming together of diverse minds who enjoy collaborating in an inspirational environment.

Through our commitment to diversity, inclusion and belonging and by living our five powerful principles we’ve created a culture where everyone feels welcome to contribute.

It’s a culture that won us The Best Workplace Culture Award’. By embracing and celebrating what makes us unique we encourage everyone to bring their full self to work.

We’re also committed to providing an accessible recruitment process, so if you require reasonable adjustments at any stage during our recruitment process please get in touch and let us know.

We are the place where human dreams, plus human endeavour, shape the future of aerospace innovation and technology.

Last updated : 2024-05-08

Job Summary

JOB TYPE

Full Time

INDUSTRY

Durable Manufacturing

SALARY

$69k-90k (estimate)

POST DATE

05/10/2024

EXPIRATION DATE

08/07/2024

WEBSITE

gknaerospace.com

HEADQUARTERS

GARDEN GROVE, CA

SIZE

200 - 500

FOUNDED

1759

CEO

JOHN DANLEY

REVENUE

$50M - $200M

INDUSTRY

Durable Manufacturing

Related Companies
About GKN Aerospace

GKN Aerospace is the worlds leading multi-technology tier 1 aerospace supplier. We develop, build and supply an extensive range of advanced aerospace systems, components and technologiesfor use in Defence and Commercial aircraft ranging from helicopters, business jets, passenger planes to the most advanced fighter aircraft. Our technology is on board 100,000 flights a day and we are market leading in aerostructures, engine systems, transparencies and wiring systems. Lightweight composites, additive manufacturing, innovative engine systems and smart transparencies help to reduce emissions and w...eight on the aircraft and enhance passenger comfort. We are a truly global business, with 15,000 employees, working in 41 manufacturing sites across 13 countries. More
Show less

Show more
Show more

GKN Aerospace
Full Time
$117k-141k (estimate)
Just Posted
GKN Aerospace
Full Time
$69k-89k (estimate)
1 Day Ago
GKN Aerospace
Full Time
$77k-102k (estimate)
1 Day Ago

The job skills required for Master scheduler include Scheduling, Planning, Futures, etc. Having related job skills and expertise will give you an advantage when applying to be a Master scheduler. That makes you unique and can impact how much salary you can get paid. Below are job openings related to skills required by Master scheduler. Select any job title you are interested in and start to search job requirements.

For the skill of  Scheduling
PARS
Contractor
$35k-45k (estimate)
Just Posted
For the skill of  Planning
Midwest Air Traffic Control Service
Full Time
$59k-68k (estimate)
Just Posted
For the skill of  Futures
Savers
Full Time
$63k-97k (estimate)
1 Week Ago
Show more

The following is the career advancement route for Master scheduler positions, which can be used as a reference in future career path planning. As a Master scheduler, it can be promoted into senior positions as a Capacity Planning Supervisor that are expected to handle more key tasks, people in this role will get a higher salary paid than an ordinary Master scheduler. You can explore the career advancement for a Master scheduler below and select your interested title to get hiring information.

wichita-sb
Full Time
$64k-83k (estimate)
1 Week Ago
wichita-sb
Full Time
$51k-69k (estimate)
1 Week Ago

If you are interested in becoming a Master Scheduler, you need to understand the job requirements and the detailed related responsibilities. Of course, a good educational background and an applicable major will also help in job hunting. Below are some tips on how to become a Master Scheduler for your reference.

Step 1: Understand the job description and responsibilities of an Accountant.

Quotes from people on Master Scheduler job description and responsibilities

Master Schedulers operate with a wide range of companies, from consultancy services and production departments.

01/21/2022: Pascagoula, MS

Production planners or schedulers are employees who take charge of the timeliness and accuracy of the production process.

02/19/2022: Pittsfield, MA

Master Scheduler, on the other hand, can perform significantly better with tuned learning rates or decay schedulers.

02/13/2022: Champaign, IL

A master scheduler link any tasks together that need to be linked.

02/03/2022: Moline, IL

Step 2: Knowing the best tips for becoming an Accountant can help you explore the needs of the position and prepare for the job-related knowledge well ahead of time.

Career tips from people on Master Scheduler jobs

Those Master Schedulers who do attend college, typically earn either Business degrees or Management degrees.

01/23/2022: Durham, NC

According to resumes from both Master Schedulers and Production Planners, some of the skills necessary to complete the responsibilities of each role are similar.

01/18/2022: Las Cruces, NM

Become a great business analyst, product owner & scrum master with JIRA & Confluence.

01/11/2022: Cleveland, OH

Step 3: View the best colleges and universities for Master Scheduler.

Butler University
Carroll College
Cooper Union
High Point University
Princeton University
Providence College
Show more