You haven't searched anything yet.
Bristol Infrastructure Designs Services, LLC is hiring Construction Scheduler to help support the Navy Mission at the Portsmouth Navy Shipyard in Kittery, ME
The scheduler will provide assistance and technical guidance to engineers/architects exercising construction oversight and design management of capital improvements projects. Scope of projects typically is of a complex nature ranging from comprehensive repairs to unique, multi-million-dollar state-of-the-art construction. It is typical for the Scheduler to have some level of engagement with inter-related construction projects associated with a high-visibility Program Initiatives. Project delivery methods include both design-bid/build or design build.
Major Responsibilities and Required Knowledge or SkillsThe Physical demands described here are representative of those that must be met by an employee
to successfully perform the essential functions of this job.
• Mobility: Must be able to stoop, kneel, reach, walk, lift, grasp, feel, talk, hear, and perform repetitive motions.
• Hearing: Must be able to hear audible safety alarms.
• Visual Acuity: Must be adequate to perform above listed tasks in a safe manner and perform activities such as viewing a computer terminal and extensive reading.
• Lifting: Must be able to exert up to 20 pounds of force occasionally and up to 20 pounds of force frequently, and/or a negligible amount of force constantly to lift, carry, push, pull or otherwise move objects, including the human body.
Excellent salary and benefit package to include: paid time off, paid holidays, comprehensive health insurance plan including medical, dental, and vision, life insurance, long term disability insurance; 401(k) plan with employer match.
Full Time
$63k-80k (estimate)
04/29/2024
05/12/2024
The following is the career advancement route for Construction Scheduler positions, which can be used as a reference in future career path planning. As a Construction Scheduler, it can be promoted into senior positions as a Planner/Scheduler II - Construction that are expected to handle more key tasks, people in this role will get a higher salary paid than an ordinary Construction Scheduler. You can explore the career advancement for a Construction Scheduler below and select your interested title to get hiring information.