Recent Searches

You haven't searched anything yet.

8 INSTALLATION & PLANNING SPECIALIST Jobs in San Antonio, TX

SET JOB ALERT
Details...
Southwest Research Institute
San Antonio, TX | Full Time
$104k-133k (estimate)
2 Weeks Ago
Alterman Group Inc
San Antonio, TX | Full Time
$86k-114k (estimate)
3 Months Ago
BBNCALLJOBSROLLUP
San Antonio, TX | Part Time
$67k-84k (estimate)
1 Week Ago
SSTCANDIDATEPORTAL
San Antonio, TX | Part Time
$67k-84k (estimate)
1 Week Ago
BRS
San Antonio, TX | Part Time
$67k-84k (estimate)
2 Weeks Ago
BRS
San Antonio, TX | Part Time
$67k-84k (estimate)
2 Weeks Ago
US Defense Health Agency
San Antonio, TX | Full Time
$69k-85k (estimate)
4 Months Ago
INSTALLATION & PLANNING SPECIALIST
Alterman Group Inc San Antonio, TX
$86k-114k (estimate)
Full Time 3 Months Ago
Save

Alterman Group Inc is Hiring an INSTALLATION & PLANNING SPECIALIST Near San Antonio, TX

Position Summary:

The Installation and Planning Specialist is responsible for ensuring compliance with the PACK (Packaged Alterman Construction Kit) process. Reporting to the Installation & Planning Manager, you will work closely with preconstruction, project support, and manufacturing to reduce material cost, provide labor effective solutions, and improve overall processes.

Duties, Responsibilities, and Tasks:

  • Coordinate with Project Designers, BIM Technicians, Project Managers, and the Field to ensure resources are allocated appropriately.
  • Schedule workforce, set requirements, and evaluate ability of personnel.
  • Plan, schedule and coordinate the flow of products through the complete manufacturing process.
  • Implement, maintain, and evaluate means of quality control in design and manufacturing.
  • Ensure that all company safety policies are being followed and adhered to.
  • Ensure that all schedules and completion dates are met efficiently.
  • Continually evaluate best work practices for field installation.
  • Evaluate projects for the impact of providing design and Packaged Alterman Construction Kits (PACKs).
  • Collaborate with Project Managers to develop installation timelines, resources and budgets.
  • Review installation plans and specifications to ensure compliance with PACK requirements.
  • Ensure operational alignment with PACK, optimizing improvements in processes and procedures.
  • Interface with Purchasing and Logistics to ensure schedules are achieved.
  • Update and advise the Installation & Planning Manager regarding status and any issues that affect committed projects withing the Industrial division.
  • Advise the Installation & Planning Manager on potential upcoming projects regarding projected VDC workforce requirements.

Knowledge, Skills and Abilities

  • Ability to read drawings, specifications, and submittals.
  • In depth understanding of installation means and methods used in the electrical construction industry, with an emphasis on front end design produced prefabrication and pre-assembly of electrical products and assemblies.
  • Strong understanding of construction methods across multiple trade disciplines. Preferably in concrete forming and placement, steel erection, mechanical, and framing.
  • Must have a firm understanding of the order and durations for electrical installation and the disciplines above.
  • Excellent organizational, interpersonal, verbal, and written communication skills.
  • Ability to demonstrate and maintain a strong knowledge of procurement and logistics.
  • Advanced analytical and problem-solving skills.
  • Proficient with Microsoft Office Suite and Bluebeam. Proficiency with Microsoft Power Platform Software Suite preferred.
  • Ability to learn and use related software and systems as required.
  • Ability to prioritize and manage multiple tasks in a high production environment while responding quickly and effectively under pressure to tight timelines/deadlines.
  • Ability to collaborate and effectively communicate with internal and external customers and vendors.

Education and Experience:

  • Bachelor’s degree from an accredited university is preferred or 6 years of construction experience is required.
  • Minimum 6 years of experience in scheduling, project management or other operational roles.

Work Environment:

  • Office environment with periodic travel to jobsites required.

Physical Demands:

  • Must be able to talk and hear.
  • Must be able to sit frequently.
  • Must be able to occasionally stand, walk, climb, balance, crouch or crawl, stoop, and kneel.
  • Must be able to safely operate a vehicle to travel to and from job sites.
  • Must be able to regularly lift and/or move up to 10 pounds and occasionally lift and/or move up to 40 pounds.
  • Must be able to safely maneuver in a construction environment.

Job Summary

JOB TYPE

Full Time

SALARY

$86k-114k (estimate)

POST DATE

02/05/2024

EXPIRATION DATE

06/07/2024

Show more

Alterman Group Inc
Full Time
$100k-131k (estimate)
1 Week Ago
Alterman Group Inc
Full Time
$44k-57k (estimate)
2 Weeks Ago
Alterman Group Inc
Full Time
$148k-193k (estimate)
1 Month Ago