What are the responsibilities and job description for the Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction position at KALCON?
Minimum Qualifications
Field Oversight & Inspection
Oversee Installation Of Cabling For
At a minimum, the candidate's professional resume must include the following:
- A four-year degree in Construction Management, Electrical Engineering, or a related field is preferred.
- In lieu of a degree, equivalent field experience in low voltage systems installation and supervision will be considered.
- Minimum of 4 years of experience in low voltage infrastructure, including cable tray, conduit, and equipment installation.
- Experience supporting mission critical or high-tech construction projects.
- Familiarity with security, network/WAP, and controls cabling systems.
- Experience with commissioning processes, including script assignment and documentation in platforms such as Cx Alloy.
- Strong understanding of installation quality standards, labeling protocols, and clean workmanship practices.
- Proficiency in construction management software such as Procore or Autodesk Construction Cloud (ACC).
- Excellent communication and coordination skills across disciplines and vendors.
- Ability to manage punch list resolution and ensure timely corrective actions.
Field Oversight & Inspection
- Conduct field inspections to verify that low voltage systems installation is progressing according to schedule.
- Assess installation quality to ensure compliance with design documents.
- Document findings using platforms such as Procore or Autodesk Construction Cloud (ACC) and follow up to
- Collaborate with Q-Systems support to provide onsite oversight, direction, and coordination across disciplines.
- Oversee installation of Outside Plant (OSP) and Inside Plant (ISP) pathways.
- Monitor base building low voltage cable tray installation.
- Inspect conduit rough-in for compliance and readiness.
- Ensure network rooms are prepared for equipment installation and meet design specifications.
Oversee Installation Of Cabling For
- Security systems
- Network and Wireless Access Points (WAP)
- Controls systems
- Security systems
- Network and WAP infrastructure
- Building Management System (BMS) and Emergency Power Supply (EMPS) controls
- Confirm proper installation of devices and equipment.
- Ensure labeling is accurate and workmanship is clean and professional.
- Coordinate and monitor commissioning efforts for security systems.
- Assign commissioning scripts to equipment within Cx Alloy.
- Witness commissioning activities and document results in Cx Alloy.
- Track and follow up on punch list items to ensure resolution and path to completion.
- Medical insurance
- Dental Insurance
- Vision Insurance
- 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
- 15 days of paid time off
- 8 paid National Holidays
- Reimbursement for professional licenses and certifications
At a minimum, the candidate's professional resume must include the following:
- List of all Educational Achievements
- List of all Professional Licenses or Certificates
- List of Awards Received
- Detailed Employment History with each company:
- Name of the firm or agency
- Start Date and End Date (Month & Year)
- Positions Held