What are the responsibilities and job description for the Quality Control Inspector - Data Center Construction position at WEITZ-ABITAT MISSION CRITICAL?
You Don’t Just Set the Standard for the Project, You’re the Blueprint Behind It
SEARCH JOBS
Keyword(s)
Matching job links will appear below as you type.
Location When autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
Radius Select miles 5 miles 15 miles 25 miles 35 miles 50 miles 75 miles 100 miles
Quality Control Inspector - Data Center Construction
San Marcos, Texas
Apply Now
Quality Control Full time R-100264
Share this job
The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA. What You’ll Do: Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in) Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards Ensure inspections, observations and punch list are documented and stored in accordance to company policy Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to Perform other duties as assigned What We’re Looking For: Experience:A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environmentLEAN principles experience is desirable. Data center experience is strongly preferred. Skills: Excellent verbal and written communicationAbility to balance and prioritize projects with impending deadlines Detail-oriented and highly organized Business acumen and relationship-building skills Technology:Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.Solid systems experience with Procore and Bluebeam is preferred.Training will be provided on company standards. What We Offer: Competitive Pay Rewarding Bonus Program Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings Employer-Paid Short- and Long-Term Disability Programs Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K Retirement Savings Plan with Company Match Tuition Reimbursement Fully Paid Parental Leave Voluntary Products Including: Critical Illness Insurance and Accident Insurance Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.
By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.
You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.
Apply Now
Explore This Area
Work That’s Meaningful >
We are more than construction —it’s about the people who show up every day with pride and purpose, building work that has meaning to a community.
Jobs for you
You have not saved any jobs yet.
Join Our Talent Community
Be one of the first to see the latest jobs here at Weitz and get up-to-date company news!
Sign up for Talent Community
Join our Talent Community by registering and receive regular updates on opportunities, events, and career information.
First Name
Last Name
Email Address*
Phone Number
InterestPlease select a category or location option. Click “Add” to create your job alert.
CategoryWhen autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
LocationWhen autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
By signing up, I acknowledge I have read the Weitz privacy policy, and I wish to receive email communications and SMS communications. I understand I can opt-out from receiving email and SMS communications at any time.
The weitzway in action
Inside our culture Learn More
TOP 5 TRAITS FOR A PM Learn More
Empowering You With Benefits Learn More
Quality Control Inspector - Data Center Construction
San Marcos, Texas
Apply Now
Quality Control Full time R-100264
Job Description:
The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA. What You’ll Do: Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in) Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards Ensure inspections, observations and punch list are documented and stored in accordance to company policy Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to Perform other duties as assigned What We’re Looking For: Experience:A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environmentLEAN principles experience is desirable. Data center experience is strongly preferred. Skills: Excellent verbal and written communicationAbility to balance and prioritize projects with impending deadlines Detail-oriented and highly organized Business acumen and relationship-building skills Technology:Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.Solid systems experience with Procore and Bluebeam is preferred.Training will be provided on company standards. What We Offer: Competitive Pay Rewarding Bonus Program Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings Employer-Paid Short- and Long-Term Disability Programs Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K Retirement Savings Plan with Company Match Tuition Reimbursement Fully Paid Parental Leave Voluntary Products Including: Critical Illness Insurance and Accident Insurance Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.
By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.
You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.
Apply Now
Job Description:
The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA. What You’ll Do: Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in) Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards Ensure inspections, observations and punch list are documented and stored in accordance to company policy Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to Perform other duties as assigned What We’re Looking For: Experience:A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environmentLEAN principles experience is desirable. Data center experience is strongly preferred. Skills: Excellent verbal and written communicationAbility to balance and prioritize projects with impending deadlines Detail-oriented and highly organized Business acumen and relationship-building skills Technology:Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.Solid systems experience with Procore and Bluebeam is preferred.Training will be provided on company standards. What We Offer: Competitive Pay Rewarding Bonus Program Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings Employer-Paid Short- and Long-Term Disability Programs Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K Retirement Savings Plan with Company Match Tuition Reimbursement Fully Paid Parental Leave Voluntary Products Including: Critical Illness Insurance and Accident Insurance Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.
By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.
You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.
SEARCH JOBS
Keyword(s)
Matching job links will appear below as you type.
Location When autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
Radius Select miles 5 miles 15 miles 25 miles 35 miles 50 miles 75 miles 100 miles
Quality Control Inspector - Data Center Construction
San Marcos, Texas
Apply Now
Quality Control Full time R-100264
Share this job
- X
- Email
The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA. What You’ll Do: Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in) Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards Ensure inspections, observations and punch list are documented and stored in accordance to company policy Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to Perform other duties as assigned What We’re Looking For: Experience:A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environmentLEAN principles experience is desirable. Data center experience is strongly preferred. Skills: Excellent verbal and written communicationAbility to balance and prioritize projects with impending deadlines Detail-oriented and highly organized Business acumen and relationship-building skills Technology:Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.Solid systems experience with Procore and Bluebeam is preferred.Training will be provided on company standards. What We Offer: Competitive Pay Rewarding Bonus Program Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings Employer-Paid Short- and Long-Term Disability Programs Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K Retirement Savings Plan with Company Match Tuition Reimbursement Fully Paid Parental Leave Voluntary Products Including: Critical Illness Insurance and Accident Insurance Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.
By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.
You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.
Apply Now
Explore This Area
Work That’s Meaningful >
We are more than construction —it’s about the people who show up every day with pride and purpose, building work that has meaning to a community.
Jobs for you
- Featured Jobs
- Recently Viewed Jobs
- Saved Jobs
- Quality Control Inspector - Data Center Construction San Marcos Texas, United States
- Human Resources (HR) Specialist Des Moines Iowa, United States
- Senior Designer Davenport Iowa, United States
- Project Engineer II - (Data Center) - Traveling Tucson Arizona, United States
You have not saved any jobs yet.
Join Our Talent Community
Be one of the first to see the latest jobs here at Weitz and get up-to-date company news!
Sign up for Talent Community
Join our Talent Community by registering and receive regular updates on opportunities, events, and career information.
First Name
Last Name
Email Address*
Phone Number
InterestPlease select a category or location option. Click “Add” to create your job alert.
CategoryWhen autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
LocationWhen autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures.
- Quality Control, San Marcos, Texas, United StatesRemove
By signing up, I acknowledge I have read the Weitz privacy policy, and I wish to receive email communications and SMS communications. I understand I can opt-out from receiving email and SMS communications at any time.
The weitzway in action
- Inside our culture
Inside our culture Learn More
- TOP 5 TRAITS FOR A PM
TOP 5 TRAITS FOR A PM Learn More
- Empowering You With Benefits
Empowering You With Benefits Learn More
Quality Control Inspector - Data Center Construction
San Marcos, Texas
Apply Now
Quality Control Full time R-100264
Job Description:
The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA. What You’ll Do: Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in) Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards Ensure inspections, observations and punch list are documented and stored in accordance to company policy Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to Perform other duties as assigned What We’re Looking For: Experience:A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environmentLEAN principles experience is desirable. Data center experience is strongly preferred. Skills: Excellent verbal and written communicationAbility to balance and prioritize projects with impending deadlines Detail-oriented and highly organized Business acumen and relationship-building skills Technology:Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.Solid systems experience with Procore and Bluebeam is preferred.Training will be provided on company standards. What We Offer: Competitive Pay Rewarding Bonus Program Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings Employer-Paid Short- and Long-Term Disability Programs Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K Retirement Savings Plan with Company Match Tuition Reimbursement Fully Paid Parental Leave Voluntary Products Including: Critical Illness Insurance and Accident Insurance Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.
By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.
You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.
Apply Now
Job Description:
The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA. What You’ll Do: Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in) Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards Ensure inspections, observations and punch list are documented and stored in accordance to company policy Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to Perform other duties as assigned What We’re Looking For: Experience:A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environmentLEAN principles experience is desirable. Data center experience is strongly preferred. Skills: Excellent verbal and written communicationAbility to balance and prioritize projects with impending deadlines Detail-oriented and highly organized Business acumen and relationship-building skills Technology:Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.Solid systems experience with Procore and Bluebeam is preferred.Training will be provided on company standards. What We Offer: Competitive Pay Rewarding Bonus Program Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings Employer-Paid Short- and Long-Term Disability Programs Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K Retirement Savings Plan with Company Match Tuition Reimbursement Fully Paid Parental Leave Voluntary Products Including: Critical Illness Insurance and Accident Insurance Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.
By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.
You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.