Demo

Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist

Solvere Technical Group
Mobile, AL Full Time
POSTED ON 5/23/2026
AVAILABLE BEFORE 6/21/2026
Solvere Technical Group is actively seeking a qualified Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist candidate for an upcoming U.S. Coast Guard opportunity. This position is contingent on award.

Specific Duties & Responsibilities

  • Plan, organize, and conduct EVMS surveillance activities to ensure the shipbuilder's management control system complies with EVMS guidelines and provide timely indications of actual and potential problems.
  • Conduct detailed analysis of the Shipbuilder's IMS for all OPCs; determine compliance with OPC Production Contract/CLIN requirements, DCMA standards, and ANSI-EIA 748 guidelines.
  • Maintain OPC physical progressing model using Microsoft Project, SharePoint, and Power BI; audit shipbuilder reported physical progress as directed by the PMR.
  • Assist in validating Shipbuilder EVM variance reports (CPR, CFSR, CCDR, IMS); reconcile reports and assess system health.
  • Assist in determining PMB compliance and EAC analysis; review Contractor external cost and schedule reports.
  • Identify and analyze schedule conflicts or delays; propose resolutions and provide input to risk management activities.
  • Develop and provide comprehensive EVM/IMS reports and presentations detailing findings, risks, and recommended corrective actions.
  • Create and update the USCG OPC PRO program plan annually utilizing Primavera or MS Project, including WBS, work packages, task books, and time-phased costs.
  • Conduct production surveillance in Shipbuilder facilities and onboard OPCs under construction; conduct CDRL review and generate contract correspondence.
  • Prepare scheduling materials (Gantt Charts, Milestone Charts) and attend meetings; provide EVM and IMS status presentations.

Required Knowledge, Skills, And Abilities

  • Comprehensive knowledge of shipbuilding processes.
  • Proficiency in MS Project and Primavera scheduling software.
  • Ability to produce EVM reports, briefs, and presentations.
  • Knowledge of economic, statistical, accounting, and financial analysis principles and techniques.
  • Familiarity with DCMA standards and ANSI-EIA 748 guidelines.
  • Knowledge of DCMA and DCAA auditing organizations and the overall acquisition process.
  • Knowledge of Microsoft Office suite including Word, PowerPoint, Power BI, and Excel.
  • Physical ability to walk through an active shipyard and OPCs under construction.

Education, Certification And Experience

  • Bachelor's degree in an engineering or related technical/business field required or Five (5) or more additional years of relevant experience, or EVM certification (EVMP or EVMD/EVMO).
  • Minimum of five (5) years of experience supporting project management and shipbuilding processes required.

WORK LOCATION:

  • Mobile, AL

Security

  • Secret level security clearance required.
  • Non-Disclosure Agreement (NDA) required.

Benefits

Solvere offers a comprehensive and generous benefits package. The Solvere benefits package includes medical, dental, and vision insurance for the employee and/or families. Solvere also includes basic life insurance plus short- and long-term disability for the employee. Employees may elect to enroll in our company’s 401k plan. Employees will also accrue paid time off and holidays. Additional voluntary options include supplemental insurance plans.

About the Company Visit: www.solveretechnical.com

Solvere Technical Group is committed to non-discrimination and equal employment opportunity. All qualified applicants will receive consideration for employment without discrimination based on disability, protected veteran status or any other characteristics protected by law.

Salary.com Estimation for Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist in Mobile, AL
$49,685 to $62,972
If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist?

Sign up to receive alerts about other jobs on the Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$72,650 - $95,062
Income Estimation: 
$97,014 - $129,585
Income Estimation: 
$84,607 - $110,839
Income Estimation: 
$44,944 - $57,970
Income Estimation: 
$158,672 - $239,004
Income Estimation: 
$48,861 - $61,571
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Solvere Technical Group

  • Solvere Technical Group Norfolk, VA
  • Solvere Technical Group is looking for a senior Project Manager to support an upcoming U.S. Coast Guard program. The Program Manager shall institute and ma... more
  • 1 Day Ago

  • Solvere Technical Group San Diego, CA
  • Solvere is seeking a detail-oriented Senior Financial Analyst III to join our team. The Financial Analyst III will perform Lead Analyst functions. The Lead... more
  • 1 Day Ago

  • Solvere Technical Group Mobile, AL
  • Solvere Technical Group is actively seeking a qualified candidate for an upcoming opportunity with the U.S. Coast Guard. This position is contingent on awa... more
  • 2 Days Ago

  • Solvere Technical Group Mobile, AL
  • Solvere Technical Group is actively seeking a qualified Business and Contracting Officer Representative (COR) Support Specialist candidate for an upcoming ... more
  • 2 Days Ago


Not the job you're looking for? Here are some other Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist jobs in the Mobile, AL area that may be a better fit.

  • THE MCHENRY MANAGEMENT GROUP, LLC Mobile, AL
  • Description: Background check, US Citizenship, CAC and a secret clearance are requirements of this position. Contingent on contract award. Travel is 10%. I... more
  • 1 Month Ago

  • Zantech Mobile, AL
  • Are you looking for your next challenge? Are you ready to work with a performance-based small company? At Zantech, we are a dynamic Woman Owned Small Busin... more
  • 2 Days Ago

AI Assistant is available now!

Feel free to start your new journey!