Demo

Sr. Technical Project Manager - Data Center Construction

NTI Connect LLC
Gahanna, OH Full Time
POSTED ON 9/14/2025
AVAILABLE BEFORE 10/13/2025

National Technologies (NTI) is a premier turn-key provider of fiber optic and data center installation services.  Whether it be learning the latest techniques in the field or working with vendors to maximize material performance, NTI is consistently on the leading edge of innovation in the Telecommunications field.

If being a part of a tight-knit organization that gets to operate in some of the most innovative environments around the world sounds like a dream job, then you should experience the culture at NTI!  While providing the typical perks a large company offers, NTI remains true to its roots and at the core of our Company is a family-oriented business that treats our team as integral members of the organization and not just a number.  The open door, collaborative nature of NTI allows for professional growth and cultivates the ideas to keep our Company moving into the future of the industry!


Job Summary: The primary responsibilities of the role are the direct management of the most complex network fiber projects and oversight of all fiber maintenance in market. 

Job Duties and Responsibilities: 

  • Provide technical expertise to peers and management as a subject matter expert (SME) in your field.
  • Take ownership of the most complex projects, shepherding them to successful completion. Build project plans, scope of work (SOW), bill of materials (BOM), order and track materials, and schedule team members.
  • Responsible for daily management of splicing and testing of OSP facilities.
  • Assists in the planning and implementation of fiber connectivity solutions programs and projects that adhere to approved plans, budgets and schedules for various customers
  • Manage multiple projects concurrently, ensure quality delivery on schedule.
  • Develop less senior project managers through direct support and mentoring efforts.
  • Review all PM and JPM fiber projects for accuracy, profitability, and adherence to corporate values.
  • Perform periodic QA inspections of all active field projects.
  • Participate in pre-construction and regular status meetings with customers and other vendors. Ensure clear expectations, scopes of work.
  • Conduct site walks and validate that plans and expectations align with conditions.
  • Collaborate with peers and operations management to ensure project success. Validate material inventories and appropriate resources are scheduled to make all job timelines.
  • Prepare all reports and close out documents per job requirements.
  • Be reachable 24/7 to support customers and team members with urgent needs, including emergency and scheduled maintenance, outages, and quick turn quoting.

Job Knowledge, Skills, and Abilities: 

  • Expert in both fiber optic network maintenance and emergency restoration processes.
  • Expert level understanding of communications cabling types.
  • Must have extensive experience in maintaining fiber-optic deployments of outside plant networks.
  • Deep familiarity with the materials, manufacturers, and equipment related to communications cabling products, fiber optic cable and OSP splice enclosures.
  • Ability to read and interpret blue-prints, splice engineer packages, and network design drawings. Extrapolate requirements to create take off materials including quotes, scope of work (SOW), method of procedure, etc.
  • Strong ability to accurately estimate labor effort and materia I requirements.
  • Expert knowledge of fiber optic testing techniques and requirements.
  • Excellent familiarity with fiber splicing methods, splicing and testing equipment, and all related documentation standards.
  • Excellent interpersonal and communications skills, focused on customer service.
  • Extensive knowledge of safety, security, Telcordia standards and industry best practices.
  • Strong proficiency with the MS office suite, Outlook, Power Point.
  • Experience with Visio, Bluebeam Revu, or Revit a plus.

 Education and Experience: 

  • Must hold a valid driver's license.
  • High School diploma or equivalent.
  • Must have 4 years familiarity with all types of outside plant fiber engineering and experience managing large fiber networks.
  • PMP or equivalent certification and minimum 5 years managing and maintaining fiber networks ora
  • Minimum of 7 years managing and maintaining fiber networks.

 Physical Requirements: 

  • Prolonged periods sitting at a desk and working on a computer.
  • Must be able to lift up to 15 pounds at times.

 Pay rates may vary based on skills, background, experience and specific location.
  
Network Connex is committed to creating a workplace environment where every employee can strive for excellence. To achieve our workplace vision, we provide the following benefits: 

  • Health/Dental/Vision/Prescription Plan: Health, dental, and prescription insurance are available on the 1st of the month following your start date. 
  • Basic Life Insurance and Short-Term Disability Insurance fully funded by the company.
  • 401(k) Plan with Employer Matching immediate vesting.
  • 10 Paid Holidays per year.


The duties and responsibilities described above are not a comprehensive list and additional tasks may be assigned.


Network Connex provides a comprehensive benefits package including 401(k), health, dental, vision, life, and disability insurance. Network Connex is an equal-opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, gender, or national origin.  Upon acceptance of an offer, all candidates will be required to pass a background check and drug screening 

EOE-Minority/Female/Disability/Veteran Network Connex believes all persons are entitled to equal employment opportunities and does not discriminate against its employees or applicants for employment because of race, color, gender, affectional or sexual orientation, domestic partnership status, ancestry, religion, national origin, citizenship status, marital status, disability, veteran status, age or any other protected group status.

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Sr. Technical Project Manager - Data Center Construction?

Sign up to receive alerts about other jobs on the Sr. Technical Project Manager - Data Center Construction career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$119,549 - $147,509
Income Estimation: 
$140,655 - $170,536
Income Estimation: 
$149,193 - $177,728
Income Estimation: 
$177,242 - $220,510
Income Estimation: 
$71,709 - $89,893
Income Estimation: 
$87,720 - $106,708
Income Estimation: 
$108,098 - $130,480
Income Estimation: 
$131,611 - $156,576
Income Estimation: 
$131,611 - $156,576
Income Estimation: 
$141,102 - $168,742
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at NTI Connect LLC

NTI Connect LLC
Hired Organization Address Mesa, AZ Full Time
National Technologies (NTI) is a premier turn-key provider of fiber optic and data center installation services. Whether...
NTI Connect LLC
Hired Organization Address Gahanna, OH Full Time
Full Time Northern VA - Columbus OH Network Connex has been serving the telecom industry for more than 20 years, Network...
NTI Connect LLC
Hired Organization Address Denver, CO Full Time
Full Time Denver, CO Network Connex has been serving the telecom industry for more than 20 years, Network Connex acceler...
NTI Connect LLC
Hired Organization Address Manassas, VA Full Time
National Technologies (NTI), a Network Connex Company, is a premier turnkey installer of fiber optic and data center inf...

Not the job you're looking for? Here are some other Sr. Technical Project Manager - Data Center Construction jobs in the Gahanna, OH area that may be a better fit.

AI Assistant is available now!

Feel free to start your new journey!