Demo

QA/QC Data Center Construction Commissioning Agent

InPwr
Indianapolis, IN Full Time
POSTED ON 11/25/2025
AVAILABLE BEFORE 12/24/2025

InPwr, Inc. is looking for a seasoned QA/QC Data Center Commissioning Agent to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, with offices in Denver, CO, Los Angeles, CA, and Naples, FL. Named a 2019, 2022, 2023, and 2024 Top Places to Work, we believe in building it better, focus on complex opportunities, and taking the electrical design to the next level, with licenses in over forty states and projects across the nation.


We InPwr people through personal commitment, relentless dedication, and driving results together. Come Join our Team!


Benefits:

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary


Essential Functions:

  • Lead the commissioning process for electrical systems, including switchgear, UPS systems, generators, transformers, and distribution panels.
  • Review and approve electrical design documents, drawings, and schematics to ensure compliance with specifications and industry standards.
  • Coordinate and conduct functional testing, verification, and acceptance of electrical equipment and systems.
  • Identify and rectify electrical issues, including troubleshooting faults, alarms, and anomalies.
  • Provide guidance for routine maintenance and inspections of electrical systems to ensure optimal performance.
  • Generate comprehensive commissioning reports and documentation, maintaining accurate records of all activities and findings.
  • Develop and implement commissioning plans and procedures in collaboration with the project team
  • Provide training and support to operations staff on electrical systems and procedures
  • Stay abreast of industry best practices, codes, and standards related to data center electrical systems.


Skills and Requirements:

  • Bachelor’s degree in Electrical Engineering is preferred but not required.
  • Proven experience in electrical commissioning within data center or critical facility environments.
  • In-depth knowledge of electrical systems, including switchgear, UPS, generators, and power distribution.
  • Familiarity with industry standards such as NETA, NFPA, NEC, and IEEE.
  • Strong problem-solving and troubleshooting skills.
  • Excellent communication and teamwork skills.
  • Attention to detail and a commitment to upholding high-quality standards.
  • Ability to thrive in a dynamic and fast-paced environment.
  • Excellent organizational and time-management skills.
  • Proficiency in Microsoft Office Suite (Word, Excel, PowerPoint, Outlook).
  • Discretion and confidentiality when handling sensitive information.
  • Ability to multitask and adapt in a fast-paced environment.
  • Professional attitude and appearance.
  • Solid written and verbal communication skills.
  • Ability to be resourceful and proactive when issues arise.
  • Ability to work directly on site in GA, and ability to travel required.


Physical Requirements:

  • Prolonged periods sitting at a desk and working on a computer.
  • Must be able to lift up to 15 pounds at a time.


Working/ Environment/ Physical Demands to successfully perform the essential functions of this job.

  • This position sometimes operates in an office environment but will require regular visits to construction sites.
  • Job Requires working in all elements, depending on job location, time of year (heat, cold, rain, and snow).
  • Must be able to utilize construction site sanitary facilities (Porta-Johns).
  • Wear personal protective equipment (hard hat, safety glasses at all times), respirator when required.
  • Repetitive use of arms, hands, and fingers.
  • Able to work 8 hours per day, 40 hours per week, overtime as required and night shifts.
  • All elements inside and out.


EEO, Drug Free Workplace Safety has always been our priority. Along with the usual protocols to protect our workforce, vendors, and business partners, we’ve implemented additional safety standards, specifically in response to minimizing the possibility of transmission of the COVID-19 virus. Along with CDC recommended guidelines associated with hand-sanitization and safe-distancing, we’ve established procedures to reduce exposure and susceptibility. These include providing personnel with appropriate PPE, limiting non-essential foot traffic, added cleaning protocols, and encouraging open lines of communication for feedback, questions, and concerns. Employment contingent upon successful completion of background investigation and drug screening. Smoke-free workplace. Drug-free work environment according to Federal Law.

 

InPwr Inc is not currently hiring individuals for this position who now or in the future require sponsorship for employment visa status. Our hiring process includes drug & alcohol screening, E-verify, driving record, and background check. InPwr Inc.  is an Equal Opportunity Employer and a Drug-Free Workplace Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or veteran status.


Visit us at www.inpwrinc.com to apply online!

Salary.com Estimation for QA/QC Data Center Construction Commissioning Agent in Indianapolis, IN
$56,862 to $73,838
If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a QA/QC Data Center Construction Commissioning Agent?

Sign up to receive alerts about other jobs on the QA/QC Data Center Construction Commissioning Agent career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$110,166 - $150,275
Income Estimation: 
$152,161 - $215,697
Income Estimation: 
$47,264 - $63,771
Income Estimation: 
$58,614 - $74,455
Income Estimation: 
$58,614 - $74,455
Income Estimation: 
$89,787 - $123,354
Income Estimation: 
$39,468 - $49,549
Income Estimation: 
$47,264 - $63,771
Income Estimation: 
$50,124 - $77,134
Income Estimation: 
$116,510 - $189,156
Income Estimation: 
$89,787 - $123,354

Sign up to receive alerts about other jobs with skills like those required for the QA/QC Data Center Construction Commissioning Agent.

Click the checkbox next to the jobs that you are interested in.

  • Computer Simulation Skill

    • Income Estimation: $72,390 - $94,155
    • Income Estimation: $75,910 - $93,608
  • Cost Estimation Skill

    • Income Estimation: $66,378 - $103,767
    • Income Estimation: $72,477 - $98,579
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at InPwr

InPwr
Hired Organization Address Indianapolis, IN Full Time
InPwr, Inc. is looking for an Admin Coordinator - Information Systems (IS) to join our dynamic team! We are an award-win...
InPwr
Hired Organization Address Naples, FL Full Time
I nPwr, Inc. is looking for a Electrical Services Manager with Expertise in Business Development to join our dynamic tea...
InPwr
Hired Organization Address Indianapolis, IN Full Time
InPwr, Inc. is looking for experienced Field Service Electricians to join our dynamic team! We are an award-winning elec...
InPwr
Hired Organization Address Monterey, CA Full Time
I nPwr, Inc. is looking for a Service Account Manager to join our dynamic team! We are an award-winning electrical desig...

Not the job you're looking for? Here are some other QA/QC Data Center Construction Commissioning Agent jobs in the Indianapolis, IN area that may be a better fit.

AI Assistant is available now!

Feel free to start your new journey!