Demo

Mechanical Commissioning Engineer (Data Center Construction Experience)

InPwr
Indianapolis, IN Full Time
POSTED ON 7/30/2026
AVAILABLE BEFORE 8/29/2026

InPwr, Inc. is looking for a seasoned Mechanical Commissioning Engineer to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, with offices in Denver, CO, Los Angeles, CA, and Naples, FL. Named a 2019, 2022, 2023, and 2024 Top Places to Work, we believe in building it better, focus on complex opportunities, and taking the electrical design to the next level, with licenses in over forty states and projects across the nation.


We InPwr people through personal commitment, relentless dedication, and driving results together.


Come Join our Team!


Skills and Requirements:


  • Certificates and Knowledge
    • Bachelor of Science of Mechanical Engineering.
    • HVAC, CRAC, AHU, ACCU, others
    • OSHA 10
    • Complete all Safety Certifications
    • Script development for L2-L5
    • Daily Reports
      • Knowledge of CAD, Bluebeam, and others
    • Ability to work directly on site, and ability to travel required 75%


    Benefits:

    • Medical, Dental, Vision and Life Insurance 100% company paid for employees
    • Paid vacation & holidays
    • 401(k) company match
    • 30-day paid sabbatical every 5 years of employment
    • Stable employment with a growing company
    • Highly competitive salary


    A Mechanical Commissioning Engineering role involves overseeing the installation, testing, and verification of mechanical systems and equipment to ensure they are functioning correctly and meet design specifications before they are put into operation.


    Essential Functions:

    • Planning and Coordination: Participate in the planning and coordination of commissioning activities, working closely with project managers, design engineers, construction teams, and other stakeholders to ensure that commissioning activities are properly scheduled and executed.
    • Installation Verification: Verify that mechanical systems and equipment are installed according to design specifications, manufacturer's recommendations, and applicable codes and standards. This involves reviewing installation drawings, conducting site inspections, and ensuring proper alignment, assembly, and connections.
    • Functional Testing: Perform functional tests on mechanical systems and equipment to ensure they operate as intended. This may include testing components such as pumps, motors, valves, actuators, HVAC systems, plumbing fixtures, and other mechanical devices to verify their performance and functionality.
    • Performance Testing: Conduct performance tests to verify that mechanical systems meet performance requirements under normal operating conditions as well as during peak loads or other demanding scenarios. This may involve testing parameters such as flow rates, temperatures, pressures, vibration levels, and energy efficiency.
    • Documentation: Document all aspects of the commissioning process, including test procedures, test results, equipment specifications, and any modifications or adjustments made during commissioning. Accurate documentation is essential for compliance, future reference, and handover to operations and maintenance teams.
    • Training: Provide training to operations and maintenance personnel on the proper operation and maintenance of mechanical systems and equipment. This helps ensure that personnel are familiar with the systems they will be responsible for operating and maintaining.
    • Safety Compliance: Ensure that all commissioning activities are conducted in compliance with applicable safety regulations and standards to protect personnel and property. This includes implementing safety procedures, conducting risk assessments, and providing appropriate personal protective equipment (PPE) as needed.
    • Commissioning Reports: Finally, they compile commissioning reports summarizing the results of the commissioning process, documenting any issues or deficiencies identified, and providing recommendations for corrective actions or further optimization.
    • The role requires a strong foundation in mechanical engineering principles (BSME), practical experience with electrical systems and equipment, excellent problem-solving skills, attention to detail, and the ability to work effectively in multidisciplinary teams.


    Other essential functions:

    • Travel required to different sites. 75% of travel required.
    • Perform a Daily report on site.
    • Be professional in all aspects.
    • Communicate professional to the GC, EC, and Owner
    • Oversees meetings, schedules, and testing.
    • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others.
    • Mechanical team lead on site.
    • Responsible for expense reports and following company policies.
    • Oversees the QA/QC and commissioning on their area of work.
    • Able to create the Final Building report in conjunction with ECx, MCx and FLS.
    • Strong Organizational and documentational.


    Working/ Environment/ Physical Demands to successfully perform the essential functions of this job:

    • Job Requires working in all elements, depending on job location, time of year.
    • Must be able to utilize construction site sanitary facilities.
    • Work in restricted areas. 
    • Wear personal protective equipment (hard hat, safety glasses always), respirator when required. 
    • Able to work 8-10 hours per day, 40-50 hours per week.


    EEO, Drug Free Workplace Safety has always been our priority. Along with the usual protocols to protect our workforce, vendors, and business partners, we’ve implemented additional safety standards, specifically in response to minimizing the possibility of transmission of the COVID-19 virus. Along with CDC recommended guidelines associated with hand-sanitization and safe-distancing, we’ve established procedures to reduce exposure and susceptibility. These include providing personnel with appropriate PPE, limiting non-essential foot traffic, added cleaning protocols, and encouraging open lines of communication for feedback, questions, and concerns. Employment contingent upon successful completion of background investigation and drug screening. Smoke-free workplace. Drug-free work environment according to Federal Law.


    InPwr Inc is not currently hiring individuals for this position who now or in the future require sponsorship for employment visa status. Our hiring process includes drug & alcohol screening, E-verify, driving record, and background check. InPwr Inc.  is an Equal Opportunity Employer and a Drug-Free Workplace Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or veteran status.


    Visit us at www.inpwrinc.com to apply online!

    Salary.com Estimation for Mechanical Commissioning Engineer (Data Center Construction Experience) in Indianapolis, IN
    $87,812 to $109,224
    If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
    Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

    What is the career path for a Mechanical Commissioning Engineer (Data Center Construction Experience)?

    Sign up to receive alerts about other jobs on the Mechanical Commissioning Engineer (Data Center Construction Experience) career path by checking the boxes next to the positions that interest you.
    Income Estimation: 
    $72,265 - $83,772
    Income Estimation: 
    $84,546 - $99,351
    Income Estimation: 
    $158,725 - $194,124
    Income Estimation: 
    $119,658 - $160,028
    Income Estimation: 
    $197,917 - $247,739
    Income Estimation: 
    $74,551 - $88,300
    Income Estimation: 
    $85,954 - $106,408
    Income Estimation: 
    $91,017 - $111,627
    Income Estimation: 
    $91,017 - $111,627
    Income Estimation: 
    $106,299 - $135,354
    Income Estimation: 
    $108,186 - $133,193
    Income Estimation: 
    $108,186 - $133,193
    Income Estimation: 
    $134,236 - $174,128
    Income Estimation: 
    $132,162 - $161,329
    Employees: Get a Salary Increase
    View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

    Job openings at InPwr

    • InPwr Denver, CO
    • InPwr, Inc. is looking for a Senior Electrical Estimator to join our dynamic team! We are an award-winning electrical design-build firm headquartered in In... more
    • 9 Days Ago

    • InPwr Indianapolis, IN
    • InPwr, Inc. is looking for a Compensation & Benefits Manager to join our dynamic team! We are an award-winning electrical design-build firm headquartered i... more
    • 9 Days Ago

    • InPwr Indianapolis, IN
    • InPwr, Inc. is looking for a Traveling Resource Coordinator / Field Operations Coordinator to join our dynamic team! We are an award-winning electrical des... more
    • 10 Days Ago

    • InPwr Fort Myers, FL
    • InPwr, Inc. is looking for a Commercial Construction Service Account Manager to join our dynamic team! We are an award-winning electrical design-build firm... more
    • 14 Days Ago


    Not the job you're looking for? Here are some other Mechanical Commissioning Engineer (Data Center Construction Experience) jobs in the Indianapolis, IN area that may be a better fit.

    • M. A. Mortenson Company Lebanon, IN
    • Job Description Commissioning Engineer I - OFCI SUMMARY Mortenson is currently seeking a Commissioning Engineer I - OFCI to perform routine commissioning a... more
    • 9 Days Ago

    • Securitas Technology Fishers, IN
    • Securitas Technology, part of Securitas, is a world-leading provider of integrated security solutions that protect, connect, and optimize businesses of all... more
    • 13 Days Ago

    AI Assistant is available now!

    Feel free to start your new journey!