Demo

Physical Design Engineer - Block Level, Subsystem Implementation

Change Order
Austin, TX Full Time
POSTED ON 8/2/2026
AVAILABLE BEFORE 9/1/2026
Etched

Design

Austin, TX, USA

Posted on Jul 30, 2026

About Etched

Etched is building hardware for frontier intelligence. We co-design chips, racks, software, and manufacturing to deliver best-in-class throughput and latency across both prefill and decode workloads. Our first products are heavily focused on inference. Backed by hundreds of millions from top-tier investors and staffed by leading engineers, Etched is redefining the infrastructure layer for the fastest growing industry in history.

Job Summary

Etched is building a new category of AI hardware: frontier inference clusters. As a Physical Design Engineer, you will own block-level implementation from synthesis through GDSII sign-off. You will drive Block-level & Subsystem PPA Optimization, and collaborate closely with RTL designers to provide actionable feedback, ensuring we iterate at unprecedented speeds to bring our products to market.

Key Responsibilities

  • Own block-level and/or subsystem physical design end to end, including floorplanning, synthesis, placement, clock tree synthesis, and routing through GDSII.
  • Drive block-level timing closure across all corners and modes, including constraint development, STA debug, and functional and timing ECO implementation.
  • Close block-level signoff across EM, IR drop, RC extraction and correlation, and physical verification (DRC, LVS, antenna).
  • Generate abstracts, views, and timing budgets for clean hierarchical integration of your blocks into the top level.
  • Collaborate with RTL Designers and provide Physical Design feedback to improve PPA.
  • Continuously improve the PPA of owned blocks and contribute learnings back into the shared RTL-to-GDSII flow.
  • Supervise physical design work outsourced to 3rd party services and be accountable for the quality and closure of delivered blocks.

You may be a good fit if you have

  • 5-10 years of previous experience with PD
  • Tools, flow, and design methodology from RTL synthesis to GDSII sign-off
  • Experience with back-end design and timing closure on advanced process nodes (5nm and below)
  • Experience with Cadence (Innovus, Genus) or Synopsys (Fusion Compiler) automated RTL-to-GDSII flows
  • Experience with sign-off tools (PrimeTime, Tempus, Voltus, etc.)
  • Experience with UPF-based low power design methodology, power verification, synthesis, scan insertion/ATPG, formal verification, floorplanning, placement, CTS, routing, IR drop, and EM/antenna analysis
  • Scripting ability in Tcl, Python, or Perl for flow automation and debug
  • Deeply creative and able to think from first principles

Strong Candidates May Also Have Experience With

  • Familiarity with modern ML and LLM model architectures
  • Ability to program with Python or another scripting language
  • Familiarity with AI tools for programming/coding
  • Startup experience or comfort working in fast-paced environments

Benefits

  • Medical, dental, and vision packages with generous premium coverage
  • $500 per month credit for waiving medical benefits
  • Housing subsidy of $2k per month for those living within walking distance of the office
  • Relocation support for those moving to San Jose (Santana Row)
  • Various wellness benefits covering fitness, mental health, and more
  • Daily lunch and dinner in our office
  • Unlimited compute budget subject to ROI justification

How We’re Different

Etched believes in the Bitter Lesson. We are the first inference-focused frontier AI system, betting early on transformer and transformer-like architectures and on increasing model sizes. Our addressable market is the entirety of inference, unlike many of our competitors.

We greatly value engineering skills. We do not have boundaries between engineering and research, and we expect all of our technical staff to contribute to both and work across disciplines as needed.

This role is based in our Austin office, with regular time spent working alongside the team in San Jose. During the first quarter, expect to spend approximately two weeks per month at our San Jose headquarters to ramp quickly. After that, this shifts to roughly one week per month for ongoing collaboration.

See more open positions at Etched

Salary : $500 - $2,000

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Physical Design Engineer - Block Level, Subsystem Implementation?

Sign up to receive alerts about other jobs on the Physical Design Engineer - Block Level, Subsystem Implementation career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$134,206 - $155,125
Income Estimation: 
$171,024 - $193,943
Income Estimation: 
$134,206 - $155,125
Income Estimation: 
$171,024 - $193,943
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Change Order

  • Change Order San Francisco, CA
  • The Biological Computing Software Engineering, Data Science San Francisco, CA, USA Posted on Jul 31, 2026 About TBC The Biological Computing Co. (TBC) is a... more
  • Just Posted

  • Change Order Lehi, UT
  • Dandy Sales & Business Development Lehi, UT, USA Posted on Jul 31, 2026 Dandy is transforming the massive and antiquated dental industry—an industry worth ... more
  • 1 Day Ago

  • Change Order York, NY
  • Alloy Accounting & Finance New York, NY, USA USD 140k-175k / year Equity Posted on Jul 31, 2026 Alloy is where you belong! Alloy is the AI-powered identity... more
  • 1 Day Ago

  • Change Order York, NY
  • Chief Sales & Business Development New York, NY, USA USD 90k-150k / year Equity Posted on Jul 30, 2026 About Us Chief is a private network of the most powe... more
  • 1 Day Ago


Not the job you're looking for? Here are some other Physical Design Engineer - Block Level, Subsystem Implementation jobs in the Austin, TX area that may be a better fit.

  • Advanced Micro Devices, Inc Austin, TX
  • WHAT YOU DO AT AMD CHANGES EVERYTHING At AMD, our mission is to build great products that accelerate next-generation computing experiences—from AI and data... more
  • 2 Months Ago

  • Level Water Supply Engineer - Tetra Tech Careers Austin, TX
  • The Opportunity: Tetra Tech is adding a Mid-Level Water Supply Engineer to our team based in Austin, TX. Why Tetra Tech: At Tetra Tech, we are Leading with... more
  • 2 Months Ago

AI Assistant is available now!

Feel free to start your new journey!