Demo

Senior Regional Construction Scheduler

Vanir
Los Angeles, CA Full Time
POSTED ON 6/5/2026
AVAILABLE BEFORE 8/16/2026
About Vanir

Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and real estate development. Since 1964, we have consistently exceeded client expectations. Ranked as a top PMCM firm by Engineering News-Record (ENR) for more than three decades, our award-winning team provides a full range of services to public and private sector clients in the aviation; healthcare; education (K-12 and higher); justice and essential services; science and technology; state and local government; transportation; water and wastewater; energy; and commercial, residential and nonprofit markets.

Job Description

Essential Duties & Responsibilities

  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity.
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.

Minimum Qualifications

  • Graduation from a recognized college or university with a bachelor’s degree in construction management, engineering, architecture or any related field
    • OR Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four (4) years of experience in the duties to compensate for the required education.
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics
Benefits

Vanir offers a comprehensive, competitive benefits package that includes 401(k) Savings with employer matching contributions, medical, dental, vision, health savings account (HSA) with employer contributions, life, AD&D and disability benefits, flexible spending account (FSA), voluntary benefits, Teladoc, pet insurance, paid time off, national employee assistance program (EAP) and employee referral program.

How To Apply

If you're interested in working for Vanir please visit our website to learn more and to apply online at www.vanir.com .

VEVRAA Federal Contractor

Request Priority Protected Veteran Referrals

EOE Minorities/Females/Protected Veterans/Disabled

Contact Email careers@vanir.com

Persons with medical limitations may, with reasonable accommodations, be capable of performing the duties of this position. Such a determination must be made on an individual basis considering the person's limitations, the requirements of the position, and the company's ability to make reasonable accommodations to the person's limitations.

We Participate in E-Verify

Pursuant to the Ban The Box Act/Fair Chance Initiative, we will consider for employment qualified applicants with arrest and conviction records.

Posted Salary Range

USD $140,000.00 - USD $159,250.00 /Yr.

Salary : $140,000 - $159,250

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Senior Regional Construction Scheduler?

Sign up to receive alerts about other jobs on the Senior Regional Construction Scheduler career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$115,491 - $158,336
Income Estimation: 
$133,494 - $170,282
Income Estimation: 
$131,105 - $151,214
Income Estimation: 
$128,269 - $173,633
Income Estimation: 
$157,111 - $225,157
Income Estimation: 
$103,110 - $134,766
Income Estimation: 
$95,422 - $120,607
Income Estimation: 
$137,303 - $192,299
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Vanir

  • Vanir Los Angeles, CA
  • About Vanir Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and ... more
  • 1 Day Ago

  • Vanir Los Angeles, CA
  • About Vanir Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and ... more
  • 1 Day Ago

  • Vanir Phoenix, AZ
  • About Vanir Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and ... more
  • 2 Days Ago

  • Vanir Los Angeles, CA
  • About Vanir Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and ... more
  • 2 Days Ago


Not the job you're looking for? Here are some other Senior Regional Construction Scheduler jobs in the Los Angeles, CA area that may be a better fit.

  • Vanir Construction Management, Inc. Los Angeles, CA
  • About Vanir Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and ... more
  • 2 Months Ago

  • Cordoba Corporation Los Angeles, CA
  • Overview Cordoba Corporation is a leading civil engineering firm based in California specializing in education and facilities, transportation, water, and e... more
  • 29 Days Ago

AI Assistant is available now!

Feel free to start your new journey!