What are the responsibilities and job description for the Electrical Cost Estimator with NYC DEP Change Order Experience position at Toll International LLC?
Company Description Toll International LLC is a New York–based engineering and construction company focused on shaping complex urban infrastructure and skylines. Founded by a leader with deep engineering expertise, the company delivers projects ranging from transit and underground works to major structural developments. Toll International emphasizes innovation, precision, and long-term impact in every project, aiming to build both structures and lasting legacies. The organization is committed to diversity, inclusion, equity, sustainability, and social impact. Team members benefit from a culture that values work-life balance, professional growth, and collaborative success.
Role Description This is a full-time, on-site Electrical Cost Estimator position located in Yonkers, NY, focused on projects requiring NYC DEP change order experience. The Electrical Cost Estimator will prepare detailed cost estimates for electrical work on civil and infrastructure projects, including materials, labor, equipment, and subcontractor pricing. Day-to-day responsibilities include reviewing drawings and specifications, analyzing project scope, developing cost breakdowns, and preparing change order proposals in accordance with NYC DEP standards and contract requirements. The role involves collaborating with project managers, engineers, and field teams to validate quantities, assess cost impacts, and support negotiation of change orders with clients and agencies. The estimator will maintain current pricing databases, track historical cost data, and assist in budgeting, value engineering, and risk analysis to support accurate project financial planning.
Qualifications
- Experience in electrical cost estimating for civil, utility, or infrastructure projects, with specific hands-on experience preparing and managing NYC DEP change orders.
- Proficiency in reading and interpreting electrical plans, specifications, and contract documents, including ability to quantify work and identify scope changes.
- Familiarity with cost estimating software or spreadsheets, and strong skills in MS Excel or similar tools for creating detailed cost breakdowns and summaries.
- Knowledge of applicable codes, standards, and agency requirements for New York City infrastructure work, especially NYC DEP procedures and documentation.
- Strong analytical, numerical, and problem-solving abilities, with attention to detail and accuracy in measurements, pricing, and calculations.
- Effective communication and collaboration skills to work with project managers, engineers, field supervisors, and external stakeholders on estimate and change order issues.
- Ability to prioritize tasks, manage deadlines, and handle multiple projects in a fast-paced, on-site environment.
- Relevant experience in electrical construction, estimating, or project controls; prior work with public-sector or municipal infrastructure clients is highly beneficial.
- Associate or Bachelor’s degree in Engineering, Construction Management, or a related field preferred; equivalent experience in electrical estimating will be considered.
- Commitment to safety, ethical conduct, and continuous learning within