Demo

Low Voltage Technician | Structured Cabling | Data Center Construction

Team LINX
Salt Lake, UT Full Time
POSTED ON 9/27/2026
AVAILABLE BEFORE 1/24/2027

Job Summary:
Low voltage technicians work in a team environment to meet project objectives. They must have a great attitude, be dependable, willing to learn and take directions and are reliable on the job site. In this role you will be completing both ISP and OSP work.


About LINX
:
Join a team that connects people through technology. We design, install, and support commercial network cabling for data centers, multimedia, security, and wireless systems.

In 2003, industry experts founded LINX to create the workplace they wanted—one built on integrity, teamwork, and innovation. These core values drive us daily, shaping a culture where employees grow and take pride in their work.

Headquartered in Denver, CO, with regional offices in Seattle, WA; Salt Lake City, UT; San Antonio, TX; Atlanta, GA; Cheyenne, WY; and Des Moines, IA, we’re growing fast! With AI, remote work, and digital transformation accelerating, now is the time to build your future with LINX.


Where This Role Fits at LINX

Technician Lead Technician Foreman Superintendent Project Manager Senior Project Manager Operations Manager


Essential Duties and Responsibilities

  • Install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cables, ensuring proper documentation and compliance with industry standards.
  • Build, install, and maintain MDFs and IDFs, including racks, patch panels, wire management systems, and network hardware, while troubleshooting low voltage cable systems.
  • Perform cable pulling, suspension, fireproofing, termination, and testing in accordance with BICSI standards, NEC, and local regulations to ensure safety and compliance.
  • Deliver exceptional customer service, maintain professionalism and strong communication skills to resolve technical issues and provide solutions.
  • Ensure high-quality, organized, and professional workmanship on all installations to meet project specifications and exceed customer expectations.
  • Travel to job sites anywhere within your state, may also be required to travel within the USA


Minimum Requirements

Tech 1:

  • Must be able to work on ladders and use power tools; ability to lift/carry/setup a 50-pound box or ladder
  • Must own low voltage tools (strippers, screwdrivers, wrenches)
  • Able to work 2nd/3rd shift, overtime, and under pressure.
  • Must pass a 7-year background check, drug screen, and physical.
  • Requires valid driver’s license, reliable transportation, and insurance
  • Commercial construction experience preferred


Tech 2:

  • All above requirements plus a minimum 2 years of commercial low voltage installation experience
  • Able to terminate a jack, pull cable and “work a 90” proficiently with limited supervision
  • Can install, terminate, and test structured cabling systems forCAT5e, CAT6, CAT6a, fiber optic, and coaxial cables proficiently
  • Ability to build out MDF and IDF closets including racks, patch panels, wire management systems, and network hardware with supervision

Tech 3:

  • All above requirements plus a minimum of 3 years of commercial low voltage installation experience
  • Able to terminate a jack, pull cable and “work a 90” proficiently with no supervision
  • Can install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cables with no supervision
  • Ability to build out MDF and IDF closets including racks, patch panels, wire management systems, and network hardware with no supervision
  • Professional working proficiency in English


Preferred Experience (not required)

  • BICSI Technician or Installation Certification
  • Powder Actuated Tools Certification
  • Confined Space Certification
  • CPR and First Aid certified
  • Manufacturers certifications for Installation and Maintenance
  • High School Diploma


Pay Rate:

Tech 2: $21.00 - $25.00/hour

Tech 3: $23.00 - $28.00/hour


TEAMLINX offers great benefits including:

  • 401K with 50% employer match up to first 5%
  • Insurance options including medical plans with Flexible Spending and/or Health Savings Accounts, Disability, Dental and Vision
  • 8 Paid Holidays
  • 3 weeks Paid Time Off (PTO) combining sick pay and vacation days
  • Career growth opportunities


Posting Deadline:

This role will be posted until filled and may close without notice.

We are an Equal Opportunity Employer and value diversity in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic.

Benefits:

  • 401(k)
  • 401(k) matching
  • Dental insurance
  • Employee assistance program
  • Health insurance
  • Health savings account
  • Life insurance
  • Paid time off
  • Referral program
  • Vision insurance

Language:

  • English (Required)
  • Spanish (Preferred)

Willingness to travel:

  • 100% (Preferred)

Salary : $21 - $28

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Low Voltage Technician | Structured Cabling | Data Center Construction?

Sign up to receive alerts about other jobs on the Low Voltage Technician | Structured Cabling | Data Center Construction career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$90,378 - $100,910
Income Estimation: 
$102,452 - $120,738
Income Estimation: 
$90,781 - $138,352
Income Estimation: 
$96,838 - $139,002
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Team LINX

  • Team LINX Salt Lake, UT
  • Pay: $27.00 – $38.00/hour depending on experience LINX is hiring a Low Voltage Foreman in the Salt Lake City, UT area to lead crews across a diverse portfo... more
  • 1 Day Ago

  • Team LINX Salt Lake, UT
  • Pay: $20.00/hr (Tech I) to $29.00/hr (Tech III), depending on tier and experience LINX is hiring Low Voltage Technicians in the Salt Lake City, UT area to ... more
  • 1 Day Ago

  • Team LINX Des Moines, IA
  • LINX is hiring Fiber Technicians for its travel-based team that deploys to enterprise, hyperscale, and hyperscale data center builds across the country. Th... more
  • 3 Days Ago

  • Team LINX Des Moines, IA
  • LINX is hiring Fiber Specialists for its travel-based team that deploys to enterprise, hyperscale, and hyperscale data center builds across the country. If... more
  • 3 Days Ago


Not the job you're looking for? Here are some other Low Voltage Technician | Structured Cabling | Data Center Construction jobs in the Salt Lake, UT area that may be a better fit.

  • Mereo Fiber Bountiful, UT
  • Job Summary: This position acts as a field representative for our company during construction and service of multi-dwelling unit properties. The role will ... more
  • 26 Days Ago

AI Assistant is available now!

Feel free to start your new journey!