Demo

Change Order Coordinator (CO)

Sierra Proto Express
San Jose, CA Full Time
POSTED ON 4/18/2025
AVAILABLE BEFORE 6/17/2025

SUMMARY OF JOB FUNCTION: 

The CO / ECO (Change order / Engineering Change Order) Coordinator / Admin plays a key role in the product change process, supporting engineering and operations teams by reviewing incoming change requests, validating order status, and managing the flow of tasks based on the type of change. This is an entry-level, hands-on position that requires high attention to detail, organizational skills, and basic familiarity with electronics manufacturing—particularly PCBA (Printed Circuit Board Assembly) processes. Ideal for candidates looking to grow into process, documentation, or engineering support roles.   

KEY RESPONSIBILITIES: 

  • Change Request Processing: Review and assess requests (CO / ECO), ensuring completeness and accuracy of documentation.
  • Order Status Validation: Check current production and procurement order statuses to determine the impact and timing of the proposed change.
  • Workflow Assignment: Assign tasks and initiate workflows in line with defined procedures based on change type and order status (e.g., pre-production vs. in-production).
  • Cross-Functional Coordination: Cross-function Collaborate (Quote, engineering, purchasing, planning, production, …) to ensure timely execution of requests.
  • Communication with stakeholders: Communicate with internal and external team members during different stages of the request (evaluation, implementation, Clouser, …) and professionally represent the company to outside customers and business partners as needed.
  • Reporting & Follow-up: Provide status updates and assist in reporting open/closed ECOs on a regular cadence and escalate as needed.
  • Fast-Paced Problem Solving: Perform in a dynamic New Product Introduction (NPI) environment, addressing urgent technical issues with efficiency and accuracy.
  • Professionally represent the company to outside vendors, customers, and business partners as needed.  
  • Work extended hours based on company needs and be available for after-hour emergency calls.
  • Perform other duties as assigned.

QUALIFICATIONS - KNOWLEDGE/SKILLS- EXPERIENCE:

  • High School diploma required; associate degree or coursework in engineering, manufacturing, or business preferred.
  • 0–1 year of professional experience; prior internship or exposure to manufacturing is a plus.
  • Basic understanding of PCBA processes and manufacturing terminology is preferred.
  • Strong organizational skills and ability to handle multiple tasks in a deadline-driven environment.
  • Proficiency in Microsoft Office Suite (Excel, Word, Outlook, etc.).
  • Effective communication (verbal/written ) and follow-up skills.
  • Must be detail-oriented and a proactive problem solver.
  • Ability to solve practical problems using pre-established guidelines to deal with situations where only limited standardization exists.
  • Strong people management skills and ability to work with people of diverse backgrounds.
  • Highly organized and able to work with minimum supervision while maintaining effective time management.  
  • Ability to perform at the highest level in a fast-paced environment.

SUPERVISES: None


PHYSICAL DEMANDS:   The physical demands described here represent those that an employee must meet to perform the essential functions of this job successfully. While performing the duties of this job, the employee is regularly required to talk or hear. The employee must frequently stand, walk, and reach with hands and arms. The ability to lift 20 lbs., open filing cabinets, and bend, stand, or climb on step ladders as necessary.


ENVIRONMENT:  

-Manufacturing facility with exposure to electronics assembly equipment and materials.

-May require working in a controlled environment with specific temperature and humidity requirements.

-Personal Protective Equipment (PPE) required to perform work.


CA Salary range $21.00 - $26.00 with Benefits and Perks. 


Day

Salary : $21 - $26

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Change Order Coordinator (CO)?

Sign up to receive alerts about other jobs on the Change Order Coordinator (CO) career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$42,566 - $55,342
Income Estimation: 
$48,467 - $63,949
Income Estimation: 
$46,221 - $57,813
Income Estimation: 
$90,372 - $103,622
Income Estimation: 
$111,859 - $131,446
Income Estimation: 
$110,457 - $133,106
Income Estimation: 
$105,809 - $128,724
Income Estimation: 
$122,763 - $145,698
Income Estimation: 
$51,459 - $63,267
Income Estimation: 
$61,016 - $75,023
Income Estimation: 
$104,811 - $138,039
Income Estimation: 
$111,237 - $142,180
Income Estimation: 
$77,473 - $88,701
Income Estimation: 
$90,372 - $103,622
Income Estimation: 
$61,825 - $80,560
Income Estimation: 
$90,032 - $105,965
Income Estimation: 
$85,996 - $102,718
Income Estimation: 
$42,380 - $52,498
Income Estimation: 
$51,459 - $63,267
Income Estimation: 
$104,811 - $138,039
Income Estimation: 
$111,237 - $142,180
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Sierra Proto Express

Sierra Proto Express
Hired Organization Address Sunnyvale, CA Full Time
The Maintenance & Facilities Technician is responsible for performing a variety of routine and emergency maintenance to ...
Sierra Proto Express
Hired Organization Address San Jose, CA Full Time
SUMMARY OF JOB FUNCTION: The AOI Operator is responsible for properly inspecting printed circuit boards for defects and ...
Sierra Proto Express
Hired Organization Address San Jose, CA Full Time
Job Descriptions: The Laser Machine Operator is responsible for setting up, operating, and maintaining the laser stencil...
Sierra Proto Express
Hired Organization Address San Jose, CA Full Time
SMT Stencil CAM Design Engineer Sierra Circuits is a Silicon Valley-based leader in printed circuit board manufacturing ...

Not the job you're looking for? Here are some other Change Order Coordinator (CO) jobs in the San Jose, CA area that may be a better fit.

Change Order Specialist

Ryzen Solutions, Fremont, CA

Contract Change Order Administrator

saylorconsulting, San Jose, CA

AI Assistant is available now!

Feel free to start your new journey!