Demo

Data Center Construction Superintendent

Rightech
Ashburn, VA Other
POSTED ON 8/4/2026
AVAILABLE BEFORE 9/3/2026

Rightech is working with a national integrator who is in need of Superintendents to assist with Amazon data center construction build outs. This is a contract to hire position.

In this role you will manage sub-contractors responsible for the fiber build out in new construction data centers throughout Northern VA.  

​The Superintendent will travel to project sites as needed, primarily supporting mission-critical and commercial construction/data center projects.

The Superintendent is responsible for planning, supervising, and coordinating all in-house Client and the activities of one or more construction projects across various job sites. This position plays a vital role in ensuring work is performed in accordance with the customer contract, project documents, budget, and schedule.

Essential Functions:

  1. Lays out project work and ensures that materials, tools, equipment, and Client are scheduled in a timely manner to meet scope, budget, and construction schedules.
  2. Monitors worksite safety and ensures all work is completed with zero accidents.
  3. Coordinates with client personnel and internal project teams to ensure compliance with site-specific security, safety, and access protocols.
  4. Communicates design changes, RFIs, and submittals to the field team and ensures alignment across stakeholders.
  5. Schedules and oversees inspections as required by local and state codes and arranges final inspections.
  6. Prepares daily logs documenting site conditions, Client, and activities.
  7. Collaborates with the Director of Operations, Operations Manager, and foremen to maintain project momentum.
  8. Oversees punch list completion and project closeout efforts.
  9. Generates pre-construction material and tool lists and develops lookahead schedules for foremen.
  10. Directly supervises assigned field personnel and trade contractors to ensure quality, timeline, and budget expectations are met.
  11. Assists in the recruitment, onboarding, and training of field employees; promotes a safe and growth-oriented work environment.
  12. Evaluates staff performance, coaches team members, and supports ongoing employee development.
  13. Conducts timely and comprehensive performance evaluations.
  14. Operates company vehicles and equipment in compliance with safety protocols and traffic laws.
  15. Submits weekly workforce schedules for field and temp labor to support operations planning.
  16. Maintains and updates staffing forecasts to support proactive workforce planning.
  17. Participates in weekly operations meetings and project lifecycle touchpoints (kickoff, updates, closeout).
  18. Leads on-site commissioning activities and supports successful turnover.
  19. Supports estimating efforts, site surveys, and customer walk-throughs as needed.

Competencies:

  1. Strong problem-solving abilities
  2. Excellent communication and time management skills
  3. Ability to multi-task and manage priorities under pressure
  4. Proficiency with Microsoft Office Suite and Bluebeam
  5. Team leadership and mentorship

Supervisory Responsibility:
This role has direct supervisory responsibility over subcontractors, vendors, foremen, and other field staff.

Work Environment:
This role operates in a field environment and involves exposure to construction-related hazards, weather conditions, and potential high-voltage systems. Work may be required outside normal hours, including evenings, weekends, and holidays.

Physical Demands:
While performing this role, the employee may be required to stand, walk, climb ladders, use hands, reach, push/pull, and lift equipment up to 50 pounds.

Required Education and Experience:

  1. High School Diploma or GED
  2. 15 years of commercial construction/mission-critical experience, including 5 years in a supervisory capacity
  3. Valid driver's license in good standing

Preferred Education and Experience:

  1. Experience in data center construction
  2. Previous experience working in multiple jurisdictions or jobsite travel roles

Salary : $45 - $50

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Data Center Construction Superintendent?

Sign up to receive alerts about other jobs on the Data Center Construction Superintendent career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$96,838 - $139,002
Income Estimation: 
$141,880 - $286,076
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Rightech

  • Rightech Lansing, MI
  • Spotter/Tech 1. Rightech is a leading nationwide provider of technical staffing services, and we are currently seeking qualified candidates for a Spotter/T... more
  • 9 Days Ago

  • Rightech Manassas, VA
  • Position: Safety Manager Site Type: Data Center Location: Manassas, VA (NVA4) Rightech is looking for 2 safety professionals to manage both sub-contractors... more
  • 11 Days Ago

  • Rightech Port Saint Lucie, FL
  • Job Description. Job Description. Our client is a ISP / Cable television provider that supports customers, including residents, HOAs, COAs, developers, and... more
  • 11 Days Ago

  • Rightech Jacksonville, FL
  • Job Description. Job Description. Position: Project Manager. Position Type: Contract. Duration: Contract to Hire. Location: North FL ability to travel to S... more
  • 11 Days Ago


Not the job you're looking for? Here are some other Data Center Construction Superintendent jobs in the Ashburn, VA area that may be a better fit.

  • The Construction Superintendent Ashburn, VA
  • TITLE: CONSTRUCTION SUPERINTENDENT IV LOCATION: Ashburn, VA Must be willing to travel up to approximately 50% of the time POSITION SUMMMARY: The Constructi... more
  • 29 Days Ago

  • IMC Construction Career Center Bethesda, MD
  • At IMC Construction, our Superintendents are responsible for leading the jobsite and making sure projects are executed safely, efficiently, and according t... more
  • 2 Months Ago

AI Assistant is available now!

Feel free to start your new journey!