Demo

Construction Scheduler - Transmission & Substation (Pittsburgh, PA)

Quanta Infrastructure Solutions Group, LLC
Pittsburgh, PA Other
POSTED ON 10/8/2026
AVAILABLE BEFORE 10/7/2027

About Us

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.

Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role

Job Title: Construction Scheduler 

Location: Remote in the Pittsburgh, PA area initially, with the expectation to work from QISG’s future Pittsburgh office once build out is complete - timeline TBD. 

Travel: Up to 15% domestically.

 

Join our team and play a pivotal role in shaping the future of power delivery and water infrastructure projects!

We are seeking a Scheduler with 4 years of experience who will partner with Business Developers and Project Managers to drive project success through expert scheduling and planning.

 

As an advanced Primavera P6 user, you’ll support and develop detailed schedules across EPC, Design-Build, and CMAR projects, ensuring accurate forecasting and alignment with project goals.

 

You’ll have the opportunity to work on multiple high-impact projects while influencing critical decisions from start to finish.

What You'll Do

  • Develop and maintain Linear Schedule Method (LSM) and Critical Path Method (CPM) schedules, integrating cost- and resource-loaded plans that drive project efficiency.

  • Collaborate closely with engineers, estimators, procurement specialists, suppliers, and trade contractors to create, baseline, and update project schedules using industry-leading software.

  • Align project schedules with financial goals by connecting the Work Breakdown Structure (WBS) to the Financial Breakdown Structure (FBS).

  • Produce cost- and resource-loaded schedules, generate cash flow curves, and track earned value metrics and Key Performance Indicators (KPIs).

  • Support project teams in optimizing work sequences, improving productivity durations, and proactively managing risks.

  • Perform schedule analysis, time impact analysis, and maintain thorough documentation to ensure project transparency.

  • Champion short-interval scheduling practices and support continuous improvement initiatives.

  • Contribute to high-visibility projects that directly impact infrastructure growth and community development.

What You'll Bring

  • 4 years of experience developing resource- and cost-loaded schedules, with a strong understanding of earned value metrics.
  • Advanced Proficiency in Primavera P6 required.  

  • Familiarity with TILOS and Acumen software is a plus! 

  • Direct experience working with design, permitting, procurement, construction, and commissioning teams on heavy construction, power delivery, or water infrastructure projects.

  • Exceptional communication skills and the ability to collaborate across all levels of the organization.

  • Self-starter with strong time management, organizational skills, and attention to detail.

  • High school diploma or equivalent required; Bachelor’s degree in Business Administration, Engineering, Construction Management, or related field preferred.

What You'll Get

Join QISG and grow your career!

  • Competitive base salary annual bonus potential

  • Generous PTO & paid holidays to maintain work-life balance

  • 401(k) with a generous match to plan for your future

  • Comprehensive benefits – medical, dental, vision, and life insurance

  • Weekly pay for consistent, reliable compensation

  • Great mentoring & career growth opportunities – we invest in your development

At QISG, we don’t just offer a job—we offer a career where you can grow, learn, and be rewarded for your contributions.

Equal Opportunity Employer

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.We are an Equal Opportunity Employer, including disability and protected veteran status. We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Hourly Wage Estimation for Construction Scheduler - Transmission & Substation (Pittsburgh, PA) in Pittsburgh, PA
$32.00 to $40.00
If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Construction Scheduler - Transmission & Substation (Pittsburgh, PA)?

Sign up to receive alerts about other jobs on the Construction Scheduler - Transmission & Substation (Pittsburgh, PA) career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$65,079 - $82,270
Income Estimation: 
$88,573 - $114,377
Income Estimation: 
$102,413 - $133,130
Income Estimation: 
$91,640 - $116,747
Income Estimation: 
$119,541 - $162,386
Income Estimation: 
$84,607 - $110,839
Income Estimation: 
$93,323 - $124,256
Income Estimation: 
$89,713 - $125,818
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Quanta Infrastructure Solutions Group, LLC

  • Quanta Infrastructure Solutions Group, LLC Portland, OR
  • About Us QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house ... more
  • 1 Day Ago

  • Quanta Infrastructure Solutions Group, LLC Overland Park, KS
  • About Us QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house ... more
  • 1 Day Ago

  • Quanta Infrastructure Solutions Group, LLC Colorado, TX
  • About Us QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house ... more
  • 1 Day Ago

  • Quanta Infrastructure Solutions Group, LLC Delta, UT
  • About Us: QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house... more
  • 2 Days Ago


Not the job you're looking for? Here are some other Construction Scheduler - Transmission & Substation (Pittsburgh, PA) jobs in the Pittsburgh, PA area that may be a better fit.

  • Orbital Engineering, Inc. Butler, PA
  • Job Title Electrical Construction Coordinator - Substation & Transmission Line - Western Pennsylvania, Eastern Ohio Location: Western Pennsylvania and Surr... more
  • 3 Days Ago

  • Havenside Construction Group Pittsburgh, PA
  • Position Summary The Customer Experience Representative serves as the primary point of contact for customers, providing exceptional service and support thr... more
  • 20 Days Ago

AI Assistant is available now!

Feel free to start your new journey!