What are the responsibilities and job description for the NDT Inspector – Data Center Construction Texas position at Phillips Construction Inspectors?
Experienced NDT Inspector – Data Center Construction
Phillips Construction Inspectors (PCI)
Pay: $60 per hour
Location: Abilene, Texas
Employment Type: Project-Based / Contract
Work Schedule: 40–60 hours per week, based on project needs
Bonuses: 4-Month Work Ethic Bonus Christmas Bonus
Per Diem: To be discussed
Job Overview
Phillips Construction Inspectors (PCI) is seeking experienced NDT Inspectors only to support a mission-critical data center construction project in Abilene, Texas.
We are looking for qualified, dependable professionals with hands-on experience in industrial piping, welded pipe systems, and nondestructive examination. Previous data center, mission-critical, power-generation, or industrial construction experience is strongly preferred.
This is not an entry-level position. Candidates must be able to perform inspection duties independently within their qualifications, follow approved procedures, maintain accurate records, and work safely in a demanding construction environment.
Pay, Schedule & Bonuses
- $60 per hour
- 40–60 hours per week, depending on project requirements
- 4-month work ethic and performance bonus for eligible team members
- Christmas bonus for eligible team members
- Per diem to be discussed based on travel and project arrangements
- Travel and lodging arrangements to be confirmed before mobilization
- Overtime paid in accordance with applicable law
Bonus amounts, eligibility requirements, and payment terms will be provided in writing before hiring.
Responsibilities
- Perform NDT examinations of piping welds using approved methods and procedures.
- Perform RT, UT/PAUT, MT, PT, VT, or other examinations as qualified and authorized.
- Review weld maps, piping specifications, inspection procedures, and applicable acceptance criteria.
- Maintain accurate inspection reports, weld traceability, and quality records.
- Identify, document, and report weld indications, defects, and nonconforming work.
- Coordinate with QA/QC personnel, contractors, and other inspection professionals.
- Verify that inspection activities follow approved project requirements and applicable codes.
- Maintain professional conduct, dependable attendance, and clear communication.
- Follow site safety rules and stop-work requirements when unsafe conditions are identified.
- Support turnover documentation and commissioning-related quality records when required.
Required Qualifications
- Demonstrated hands-on NDT experience is required.
- Experience with industrial piping, welded pipe systems, or construction inspection.
- Current certifications and qualifications appropriate to the NDT methods being performed.
- OSHA 10-Hour Construction Safety training required, with a valid completion card.
- Ability to read weld maps, technical specifications, inspection procedures, and reports.
- Strong documentation, communication, and attention-to-detail skills.
- Reliable, safety-conscious, and able to work independently and as part of a team.
- Ability to travel to and work at the project site in Abilene, Texas.
- Availability to work 40–60 hours per week as project needs require.
Preferred Qualifications
- Previous data center or mission-critical construction experience.
- Experience with process piping, fuel-gas piping, pressure-containing welds, or mechanical systems.
- RT Level II, UT Level II, or PAUT qualifications relevant to the project scope.
- Additional applicable NDT certifications, such as MT, PT, or VT.
- OSHA 30-Hour Construction training.
- Experience with weld traceability, inspection test plans, nonconformance reports, and turnover packages.
- Experience working with general contractors, mechanical contractors, commissioning teams, or owner representatives.
Safety and Compliance
Candidates must follow all applicable site safety requirements, use required personal protective equipment, participate in site orientations and safety briefings, and maintain required training and certifications.
Any radiographic testing must be performed only by appropriately qualified personnel under the required radiation-safety controls and approved procedures.
Application Requirements
Please submit your résumé and include:
- Years of hands-on NDT experience
- NDT certifications and qualification levels
- Testing methods you are qualified to perform
- OSHA 10 completion status
- Data center or mission-critical project experience
- Industrial piping and weld inspection experience
- Availability and willingness to travel
- Earliest available start date
Entry-level applicants and candidates without relevant hands-on NDT experience will not be considered.
About PCI
Phillips Construction Inspectors (PCI) provides specialized inspection and quality support for industrial and mission-critical construction environments. We are looking for dependable professionals who take pride in safety, technical quality, documentation, and teamwork.
Join PCI and help deliver quality results on a mission-critical construction project.
Pay: $58.00 - $62.00 per hour
Expected hours: 50.0 per week
Work Location: In person
Salary : $58 - $62