Demo

Clean Tech (Data Center Construction)

Peregrine Team
Abilene, TX Full Time
POSTED ON 11/14/2025
AVAILABLE BEFORE 12/6/2025

Peregrine Team is hiring Cleaning Techs for a massive Data Center construction project in Abilene, TX!

Day shift available - Starting pay $20/hr

As a Cleaning Tech, you'll play a pivotal role in ensuring the success execution of cleaning projects from inception to completion. You'll be entrusted with various responsibilities, including learning and understanding Data Center environments.

Job Duties:

  • Comfortable in construction environments, using machinery (fork-lifts, scissor lifts, etc.)
  • Comfortable with heights and small spaces.
  • Follow directions from Supervisor and/or Team Lead
  • Clean, chemically treat, and vacuum physical surfaces within a construction, technical or GMP environment.
  • Subfloor vacuuming and wiping.
  • Drop ceiling vacuuming and wiping.
  • Clean outside of cabinets.
  • Floor surface vacuuming and mopping (both vinyl and HPL floors).
  • Dust furniture, walls, machines, or hardware.
  • Clean windows, glass allotments and mirrors utilizing foamy water or different cleaners.
  • May assist with monitoring personnel entry and exit points to controlled or sanitized areas to ensure compliance with PPE requirements.

Requirements:

  • Ability to read, write and speak English proficiently
  • Ability to pass criminal background check
  • Ability to pass substance screening
  • Must have reliable transportation
  • Valid Government-issued ID
  • Must have steel-toed (or safety-toed) boots

Preferred:

  • Knowledge of Data Centers
  • Experience as a Cleaner/Janitor
  • OSHA 10/30 Certification

Job Type: Full-time

Pay: From $20.00 per hour

Benefits:

  • 401(k)
  • Dental insurance
  • Health insurance
  • Referral program
  • Vision insurance

Work Location: In person

Salary : $20

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Clean Tech (Data Center Construction)?

Sign up to receive alerts about other jobs on the Clean Tech (Data Center Construction) career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$32,915 - $41,304
Income Estimation: 
$36,623 - $47,329
Income Estimation: 
$32,915 - $41,304
Income Estimation: 
$36,623 - $47,329
Income Estimation: 
$36,623 - $47,329
Income Estimation: 
$42,367 - $56,138
Income Estimation: 
$48,721 - $70,931
Income Estimation: 
$69,742 - $101,825
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Peregrine Team

Peregrine Team
Hired Organization Address Orange, CA Full Time
About the Role: We're seeking a dynamic HR Office Administrative Assistant to join our fast-paced HR Services team. This...

Not the job you're looking for? Here are some other Clean Tech (Data Center Construction) jobs in the Abilene, TX area that may be a better fit.

Travel LDAR Technician

Clean Harbors, Winters, TX

Clean Technician - TX

Vensure Employer Solutions, Abilene, TX

AI Assistant is available now!

Feel free to start your new journey!