What are the responsibilities and job description for the Program Specialist-Techincal Monitor position at Mississippi Department of Human Services?
Contract Opportunity: Program Specialist III: Technical Monitor
Division: Division of Community Services
Position Type: Contract (Full-Time Equivalent)
Schedule: Monday–Friday (Standard business hours); requires flexibility for occasional weekend travel.
Compensation: $59,303.19; all-inclusive)
Additional $15,196.81 (for travel & training is available)
Location: MDHS-State Office (In-state and out of state travel required)
Overtime: Not permitted under this contract.
Position Overview
This position serves as the final inspector for the state weatherization program to ensure home energy repairs are done safely and correctly. The employee will check the quality of energy efficiency upgrades and repairs completed on low-income housing to make sure it meets federal and state rules. This position requires regular field travel and working in tight spaces like attics and crawl spaces.
This position requires a strategic mix of local day travel and routine overnight stays across regional Mississippi territories to support on-site subgrantee monitoring and compliance evaluations. Active in-state travel is anticipated up to thirty to forty percent of the contract term, which translates roughly to six to eight days per month. Occasional weekend travel may be required to ensure team readiness for standard field operations or to conclude multi-day out of state training or conferences. Out-of-state travel will be anticipated for training and conferences. All approved business travel expenses, including mileage, lodging, and per diem meals, will be fully reimbursed in accordance with standard Mississippi Department of Finance and Administration travel guidelines, with personal mileage reimbursed at the current official state rate.
Scope of Work
1. Field Inspections & Quality Assurance
- Inspect finished homes to approve or reject the work done by subgrantees and subcontractors.
- Conduct physical evaluations in tight spaces like attics and crawl spaces.
- Ensure all completed installations strictly conform to state and federal safety guidelines.
2. Diagnostic Testing & Work Order Verification
- Use diagnostic testing equipment like blower doors, duct testers, and gas detectors to verify home safety and energy savings.
- Review original work orders to ensure all required insulation, sealing, and heating repairs were completed.
- Review Energy Audit Reports for accuracy and compliance with DOE and state program requirements.
3. Reporting, Paperwork & Community Liaison
- Write detailed reports of any installation errors or safety violations that contractors must fix.
- Talk to homeowners to explain the work completed and give tips on how to save energy.
- Fill out official state paperwork and keep accurate, audit-ready project files.
4. Coordination & Travel
- Conduct extensive in-state travel to support regional field monitoring operations.
· Conduct out-state travel for conferences and training as needed.
- Coordinate travel schedules to include occasional weekend travel to meet field evaluation deadlines or training requirements.
Detailed Deliverables
The contractor will be responsible for producing the following deliverables, aligned with contract timelines and DCS expectations:
1. Programmatic Oversight & Subgrantee Auditing
- Mandatorily review at least 10% of all statewide completed client files to verify eligibility paperwork, energy audit models, and final signatures.
- Audit the performance of local subgrantee QCIs to ensure their field assessments are accurate and lack bias.
- Act as the final state authority if a dispute occurs between a local agency and a mechanical contractor.
- Complete written approval or rejection notifications for each subgrantee home project reviewed.
- Track and document subgrantee correction progress and safety compliance status.
2. Diagnostic Testing & Baseline Data Logs
- Produce completed diagnostic data logs for each field inspection.
- Include structural metrics from blower doors, duct testers, and gas detectors.
- Ensure subgrantee testing gear (blower doors, monoxors, infrared cameras) is regularly calibrated according to NREL Job Task Analysis guidelines.
- Identify systemic physical failure patterns (e.g., specific subgrantees consistently missing duct sealing metrics) to stop repeat programmatic issues.
- Verify that advanced protocols for lead-safe weatherization, asbestos control, and combustion safety are strictly executed in the field.
3. Field Technical Correction & Monitoring Documentation
- Document identified service gaps, installation errors, and safety violations.
- Issue formal correction reports with required rectification actions and strict timelines.
· Conduct on-site mentoring and field demonstrations for local crews who fail to meet
Standard Work Specifications (SWS).
· Place underperforming subgrantees or individual local inspectors on formal technical rectification plans.
· Feed field observations directly back to the Program Director to help update the annual State Weatherization Plan.
4. Project Data Validation & File Integrity Reviews
- Conduct routine data quality checks within program logging systems.
- Provide written summaries of project file integrity findings and resolutions.
5. Annual Technical Program Summary Report
- Provide a comprehensive annual report summarizing program performance.
- Document inspection compliance status across all subgrantees.
- Outline key field challenges, systemic risks, and strategic technical recommendations.
Compensation & Cost Structure
- Flat contract amount: $59,303.19 ($74,500-all inclusive)
- Compensation is all-inclusive (salary, travel, administrative costs, and deliverables)
- No additional reimbursement for overtime or fringe expenses
- Payment structure may be tied to deliverables and performance milestones as defined in the contract
Minimum Qualifications (Required)
- Clear understanding of basic home construction, building materials, and how houses are built.
- Ability to obtain the BPI Energy Auditor certification first, followed by the Quality Control Inspector (QCI) certification, within 2 years of hire.
- Valid driver’s license and a clean driving record.
- Ability to pass a standard background check.
- Physically able to climb ladders, enter attics, and crawl under houses.
Preferred Qualifications
- Bachelor’s degree, with two (2) to four (4) years of experience with grants management and contract reviews.
- Special Qualifications / Alternative: Hands-on experience in residential construction, construction management, remodeling, carpentry, roofing, or HVAC. An associate degree in Carpentry, Construction Technology, or a related trade field may substitute for up to 2 years of the experience.
Required Submission Materials
- Current professional resume.
- Brief professional statement summarizing technical construction or housing inspection experience.
Additional Information
- This is a contractor position and does not establish an employer-employee relationship.
- Standard business hours apply; overtime is permitted on a case-by-case basis.
- In State and Out of State Travel is required to support statewide monitoring, training and engagement.
Salary : $15,197 - $74,500