Demo

TFO Field Project Manager - Data Center Construction

KALCON
Richmond, VA Full Time
POSTED ON 11/10/2026
AVAILABLE BEFORE 12/6/2026
KALCON is seeking an experienced TFO Field Project Manager (Owner’s Representative) to provide on-site leadership and owner representation during the tenant fit-out of mission-critical data center facilities. This role is heavily field-focused and responsible for overseeing construction execution, safety, schedule performance, quality assurance, commissioning activities, logistics coordination, and integration between base building and tenant improvement work. The ideal candidate is a proactive construction professional with data center, critical facilities, semiconductor, or similar complex project experience who can effectively manage contractors, drive accountability, resolve field challenges, and ensure projects are delivered safely, on schedule, within budget, and in alignment with the owner’s objectives. This position requires a strong understanding of construction means and methods, commissioning processes, MEP systems, and fast-paced project environments where daily field presence and hands-on leadership are essential.

Minimum Qualifications

  • - Bachelor's degree in construction management or engineering, or applicable trade/superintendent experience.
  • - 7-10 years of experience working in either design or construction of projects. Experience in Labs, Semiconductor, Data Center, and/or Critical Facility Construction is necessary.
  • - Proficient use of MS-Word, Excel, PowerPoint, Project
  • - Strong written and oral communication skills to exchange information with senior management, service providers, workers, and contractors

Tasks And Responsibilities

Field Management Focused

  • Safety Oversight
  • Schedule Oversight - Day-to-Day Tracking/Management
  • Owner/GC Coordination: Base Build GC vs. Fit-Out GC
  • MOP Coordination
  • Delivery Coordination
  • Site Logistics Coordination
  • QA/QC
  • Diving Into Plans/Specs - Understand Design Intent/Scope/Etc.
  • Ensuring GC is Executing QA/QC Plan (Project Specific)
  • Tenant Fit-Out Experience: Fast Paced Schedule
  • Busway/RPP's, Hot Aisle Containment, Conveyance, Etc.
  • Existing Buildings Retrofits: Added CRAH's, Power/Cooling, PQM Retrofit, Etc.
  • Commissioning
  • Submittals, RFI's, Procurement Log
  • Other Items:
  • OFCI Tracking
  • OAC Meetings
  • GC Weekly Reports, Safety Metrics
  • Must be on the job 5 day a week 6:30-3:30

Other Responsibilities (secondary)

  • Design Management
  • Budget/Cost
  • Change Management
  • Pay Apps

Schedule

  • Review construction manager's (CM) monthly forecast.
  • Hold weekly CPM schedule review meetings
  • Attend multiple CM/subcontractor detailed planning meetings
  • Owner Furnished Contractor Installed (OFCI) equipment schedule management
  • Vendor start up scheduling
  • Commissioning schedule coordination
  • Owner/Direct vendor schedule management (IT, Roofing Consultant, Geotech, Third Party Inspectors)
  • Customer Fitout - schedule management
  • Customer Fitout - Phase turn over alignment (base build & Tenant)

Cost

  • GMP buyout review and support
  • GMP buyout detailed analysis and ownership of recommendations
  • Provide VE recommendations with analysis
  • Change order review and approval (cost approval and process flow)
  • Proactive cost avoidance/reduction ideas
  • Monthly pay application review

Field

  • QA/QC general oversight
  • QA/QC daily review and inspection with CM
  • Safety general oversight
  • Safety daily review & inspection with CM
  • facility coordination (MOP's, Notifications)
  • Assess weekly progress and provide accurate reporting
  • Manage OFCI equipment inspection/receiving process

Project Management

  • Process cost documents (pay apps, change orders, etc.)
  • Manage and attend weekly OAC meetings and minutes
  • Provide weekly project reporting
  • Manage project closeout process (financial, O&M's, punchlist, Ops, etc.)

Design

  • After initial design, manage design coordination efforts
  • Coordinate customer fit out design package integration (non base-build)
  • Validate design cost and process changes
  • Management of construction administration process

Permit/AHJ

  • Manage and communicate overall permit process
  • AHJ inspection and certificate of occupancy process management.

Benefits Offered

  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements

At a minimum, the candidate's professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company
  • Name of the firm or agency
  • Start Date and End Date (Month & Year)
  • Positions Held
  • List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range: $140,000 USD - $220,000 USD

Salary : $140,000

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a TFO Field Project Manager - Data Center Construction?

Sign up to receive alerts about other jobs on the TFO Field Project Manager - Data Center Construction career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$107,623 - $139,321
Income Estimation: 
$133,494 - $170,282
Income Estimation: 
$131,105 - $151,214
Income Estimation: 
$128,269 - $173,633
Income Estimation: 
$157,111 - $225,157
Income Estimation: 
$140,739 - $196,237
Income Estimation: 
$198,648 - $306,929
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at KALCON

  • KALCON Columbus, OH
  • The Energization Marshal serves as KALCON's Owner's Representative supporting the client through energization planning, readiness reviews, stakeholder coor... more
  • 5 Days Ago

  • KALCON Sandston, VA
  • KALCON is seeking an experienced TFO Field Project Manager (Owner’s Representative) to provide on-site leadership and owner representation during the tenan... more
  • 6 Days Ago

  • KALCON Tualatin, OR
  • The Design Manager serves as the Owner's Representative responsible for leading, coordinating, and managing the design process across large-scale capital p... more
  • 8 Days Ago

  • KALCON Tualatin, OR
  • Document Control (Owner’s Representative) – Semiconductor KALCON is seeking detail-oriented Document Control to support the management of facility document... more
  • 8 Days Ago


Not the job you're looking for? Here are some other TFO Field Project Manager - Data Center Construction jobs in the Richmond, VA area that may be a better fit.

  • KALCON Sandston, VA
  • KALCON is seeking an experienced TFO Field Project Manager (Owner’s Representative) to provide on-site leadership and owner representation during the tenan... more
  • 6 Days Ago

  • KALCON Sandston, VA
  • KALCON is seeking an experienced Tenant Fit‑Out (TFO) Project Manager to serve as an Owner’s Representative on newly constructed data center facilities. Th... more
  • 12 Days Ago

AI Assistant is available now!

Feel free to start your new journey!