Demo

Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction

KALCON
Lufkin, TX Full Time
POSTED ON 4/2/2026
AVAILABLE BEFORE 4/30/2026
Minimum Qualifications

  • A four-year degree in Construction Management, Electrical Engineering, or a related field is preferred.
  • In lieu of a degree, equivalent field experience in low voltage systems installation and supervision will be considered.
  • Minimum of 4 years of experience in low voltage infrastructure, including cable tray, conduit, and equipment installation.
  • Experience supporting mission critical or high-tech construction projects.
  • Familiarity with security, network/WAP, and controls cabling systems.
  • Experience with commissioning processes, including script assignment and documentation in platforms such as Cx Alloy.
  • Strong understanding of installation quality standards, labeling protocols, and clean workmanship practices.
  • Proficiency in construction management software such as Procore or Autodesk Construction Cloud (ACC).
  • Excellent communication and coordination skills across disciplines and vendors.
  • Ability to manage punch list resolution and ensure timely corrective actions.

Tasks And Responsibilities

Field Oversight & Inspection

  • Conduct field inspections to verify that low voltage systems installation is progressing according to schedule.
  • Assess installation quality to ensure compliance with design documents.
  • Document findings using platforms such as Procore or Autodesk Construction Cloud (ACC) and follow up to

confirm completion of corrective actions.

  • Collaborate with Q-Systems support to provide onsite oversight, direction, and coordination across disciplines.

Pathways

  • Oversee installation of Outside Plant (OSP) and Inside Plant (ISP) pathways.
  • Monitor base building low voltage cable tray installation.
  • Inspect conduit rough-in for compliance and readiness.
  • Ensure network rooms are prepared for equipment installation and meet design specifications.

Low Voltage Cable & Equipment Installation

Oversee Installation Of Cabling For

  • Security systems
  • Network and Wireless Access Points (WAP)
  • Controls systems

Verify Installation Of Equipment Per Design For

  • Security systems
  • Network and WAP infrastructure
  • Building Management System (BMS) and Emergency Power Supply (EMPS) controls

Physical Inspection

  • Confirm proper installation of devices and equipment.
  • Ensure labeling is accurate and workmanship is clean and professional.

Commissioning (Cx) Support

  • Coordinate and monitor commissioning efforts for security systems.
  • Assign commissioning scripts to equipment within Cx Alloy.
  • Witness commissioning activities and document results in Cx Alloy.
  • Track and follow up on punch list items to ensure resolution and path to completion.

Benefits Offered

  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements

At a minimum, the candidate's professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company:
  • Name of the firm or agency
  • Start Date and End Date (Month & Year)
  • Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is

respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary.com Estimation for Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction in Lufkin, TX
$63,476 to $81,535
If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction?

Sign up to receive alerts about other jobs on the Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$63,871 - $78,758
Income Estimation: 
$83,431 - $103,091
Income Estimation: 
$78,482 - $104,838
Income Estimation: 
$90,781 - $138,352
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at KALCON

  • KALCON Rapids, IA
  • Minimum Qualifications A four-year degree in Construction Management, Electrical Engineering, or a related field is preferred. In lieu of a degree, equival... more
  • 8 Days Ago

  • KALCON Abilene, TX
  • Position Overview KALCON is looking for a self-starting Project Engineer to drive core project coordination efforts across a wide spectrum of ongoing const... more
  • 11 Days Ago

  • KALCON Port Washington, WI
  • The Scheduling Manager serves as the Owner's Representative responsible for independent oversight and analysis of contractor‑developed schedules for data c... more
  • 12 Days Ago

  • KALCON Rapids, IA
  • Seeking a Cost Engineer to provide Owner Representation with a data center owner/developer in Midland, TX. This role can be local, or remote flex with occa... more
  • 13 Days Ago


Not the job you're looking for? Here are some other Low Voltage QA/Security Cx Associate (Owner's Rep) - Data Center Construction jobs in the Lufkin, TX area that may be a better fit.

  • FixNet Network Solutions Tyler, TX
  • Overview We are seeking a dedicated and skilled Field Service Technician to join our team 1099 i n this role, you will be responsible for providing excepti... more
  • 3 Days Ago

  • Voltage Vapor Shop LLC Palestine, TX
  • MUST BE 21 TO APPLY The responsibilities will include, but not limited to: 1) Communication to customers. 2) Handling the cash register and making sales 3)... more
  • 2 Days Ago

AI Assistant is available now!

Feel free to start your new journey!