Demo

Painter

GrimeTime
Fort Benning, GA Full Time
POSTED ON 4/26/2025
AVAILABLE BEFORE 6/26/2025

We are looking for self motivated individuals who are willing to paint military housing on Fort Moore as army personally move out of these units. We will supply all paint material and train you if needed. The job is paid per job, so you have to be willing to grind. Listed below is our scope of work to give you a detailed description of what our job entails.

1. Service provider shall provide all paint, caulking, sundries, tools and
equipment as required per the detailed scope of work. Painting can be
performed by utilizing a mechanical paint sprayer or by utilizing a roller and
brush method
2. Service provider shall provide finish coats that are compatible with prime
paints used. Provider shall fill in all holes and spots repair all drywall and
plaster under a total of 32 sq. ft. and will include re-texture of the affected
areas if required. Any repair area larger than 3 sq. inch. Shall be back-primed
before paint. All repairs are to match existing texture
3. Provider is responsible for ensuring that any paint or stain applied is placed
in accordance with that manufactures stated guidelines with special
4. Provided shall not water down or thin any paint or stain except in
accordance with manufactures label directions. Ll paint and stain applied by
the provider shall remain in its origanl packaging and the labels should be
clearly visible
5. Provider acknowledges that the Property Manager maintains the right to hae
the materials and method of application provided by the provider tested at
any time throughtout the course of the work. In the event that applications or
materials are found to be unacceptable, the provider shall repair or replace
the work to the Property Manager’s satisfaction at no additional cost to the
Property Manager. Provider may also be held liable for any additional testing
that may be required to ensure contract compliance.
6. The provider shall not deviate or provide “OR EQUAL” material substitutes
unless, expressed written consent is provided by Property Manager. Should
the provider use a material other than the specified material, provider shall
be held liable for all costs incurred to re-paint or re-stain the affected areas
with the specified materials
7. Provider shall ensure that all paint installed, regardless of the number of
coats specified, shall be applied in such a fashion that the surface receiving the
paint shall be fully covered with a paint film that is of uniform finish, color

and appearance, to the satisfaction of the property manager. In the event that
full coverage is not achieved by the painter’s initial application, then the
painter shall re-apply the material until the installation is considered
acceptable at no additional charge to the Property Manager
8. Provider shall clean all overspray, paint dust and any other imperfections
caused by the application of painting or patching. Provider shall annotate
with the Turn Inspector all over sprayed items before the commencement of
work.
9. It is the responsibility of the provider to ensure that all paint touch-ups
match the paint originally installed by the provider. In the event that a
problem occurs regarding the failure of the paint to match during the touch-
up, the provider shall bear any costs incurred to correct the problem
including the cost of repair to any related trades installations
10. Provider shall submit, in writing, a list of all products and their manufactures
hat the provider intends to use, including identifying product names and
catalog numbers. The provider shall provide an 8oz. container of touch-up
paint of all types and colors used in the home. The container shall be labeled
with type, color, and shall be left on the kitchen counter at the completion of
the painting
11. Provider acknowledges that the following areas shall be properly prepped
and painted per scope of work. Please note that this list is meant to be all-
inclusive. Any other items, as listed on the pricing sheet, shall be considered
IDIQ work and shall be invoiced by utilizing a properly executed CO as
defined in section A. 1.7:
a.) All interior walls and spaces to include closest, laundry rooms, and
storerooms. Some of these rooms may be located outside the actual home
in separate rooms. Garages will be painted if they have been previously
painted. All painted surfaces will be properly prepped and painted as per
industry standards
b.) All interior and exterior doors, fronts, and backs, to include main entry
doors, exterior storeroom, utility rooms and laundry room will be
prepped and painted. All exterior doors shall be painted using exterior
enamel.
c.) All door casings, moldings, windows, and window trim shall be prepped
and painted
d.) All base boards and crown moldings throughout the interior shall be
prepped and painted
e.) All steps and stairways inside the home shall be painted if they have
previously painted and they are not carpeted

f.) All entry ways, foyers, Florida rooms, sun rooms, and patios shall be
painted if they are fully enclosed and protected from the elements
12. Ceilings will be painted as needed. The turn manager or inspector will
determine the requirement. Ceilings will be considered IDIQ work and
invoiced by utilizing a properly executed CO as defined in section A.1.7.
Basement walls and floors will also be considered IDIQ work.
13. All seems between adjacent materials will be caulked. An example would be
the base and casing next to walls along with closet shelving, cabinets, chair
rail, crown mold, etc. Old caulking will be removed and re-applied at all areas
where gaps exist between similar or dissimilar materials. All caulking will be
replaced in all locations according to industry standards
14. Provider shall not paint over efflorescence, dirt, dust, rust, chalk, scale,
grease, oil, moisture or conditions otherwise detrimental to formation of a
durable paint finish. Provider shall perform preparations and cleaning
procedures in accordance with paint manufacturer instructions
15. Provider shall caulk all base moldings to vinyl floor and caulk at all joints
between the tile and the bathtub, and the corners shall be sealed with a
Property Manager approved latex caulk
16. The provider shall caulk the interior of the windows at the head, jambs,
under the windowsills and sill where the window flange meets the studs and
the drywall
17. The painted finish work shall be free of brush marks, streaks, run laps,
holidays or any other unsatisfactory finish, to the satisfaction of the Property
Manager. Spot painting will only be allowed when the touch-up spot will
blend into surrounding finish invisible to normal viewing.
18. Provider must protect all finish hardware, cabinets, tops, light fixtures, tile,
vinyl, tubs, mirrors, windows, French doors, sliding glass doors, electrical,
TV, phone outlets, plumbing fixtures, appliances, etc. from being painted in
the event that provider paints any of the above items, they will bear all of the
cost incurred to clean the painted items to an acceptable standard or if
necessary, replace them.
19. Electrical devices, windows, unpainted HVAC vents, hardware, thermostats,
smoke detectors, and other items in place at the time of painting, shall be
either taped or covered with protective materials to avoid paint getting on
these items. Clean up of paint or caulking from these items will be the
responsibility of the provider. The provider shall replace all doors, fixtures,
plates or hardware that have been removed for painting purposes.
20. Overspray and paint splatters shall be cleaned using the proper method so as
not to damage the finish of the affected surface.

21. Special care will be given to fire suppression systems. Any sprinkler head
that gets painted will be replaced at the provider expense.
22. All window blinds will be re-installed and lowered upon completion of work.
23. All lights be turned off prior to leaving the unit each day and at completion of
the work
24. All keys will be returned to the Property Manager’s office or put in a lock box
on the front door of the house. The provider is responsible for securing the
units at the conclusion of each workday and or when the units are left
unattended. A fee of $25.00 per unit will be assessed for each unit left
unsecured after hours. In addition, $10.00 will be deducted from the invoice
every day past the due date. The due date will be 3 business days after the
house is given to the contractor
25. Provider shall follow appropriate Lead Safe Work Practices during the
performance of work.
26. HAZARDOUS MATERIALS:
- At no time shall the provider leave painting compounds or other
hazardous material containers unattended on the property. All hazardous
materials shall be stored in appropriate containers. Any hazardous waste
that is generated by the provider shall be removed from the property by
the end provider is not authorized to utilize Property Manager’s trash
bins as a method of removing or disposing of hazardous waste. Any
hazardous waste that is generated by the provider shall be removed from
the property by the end of each business day. In the event a spill occurs,
the provider shall immediately notify the Property Manager’s designated
agent.

Job Types: Full-time, Contract

Pay: $11.00 - $30.00 per hour

Schedule:

  • 8 hour shift

Work Location: In person

Salary : $11 - $30

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Painter?

Sign up to receive alerts about other jobs on the Painter career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$48,874 - $64,879
Income Estimation: 
$53,898 - $73,561
Income Estimation: 
$42,799 - $54,410
Income Estimation: 
$48,874 - $64,879
Income Estimation: 
$48,874 - $64,879
Income Estimation: 
$53,898 - $73,561

Sign up to receive alerts about other jobs with skills like those required for the Painter.

Click the checkbox next to the jobs that you are interested in.

  • Corrective Maintenance Skill

    • Income Estimation: $41,592 - $69,410
    • Income Estimation: $45,176 - $68,103
  • Preventive Maintenance Skill

    • Income Estimation: $45,396 - $60,803
    • Income Estimation: $41,592 - $69,410
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Not the job you're looking for? Here are some other Painter jobs in the Fort Benning, GA area that may be a better fit.

Painter

Marmon Holdings, Inc., La Grange, GA

Automotive Painter

Caliber Collision, Columbus, GA

AI Assistant is available now!

Feel free to start your new journey!