Demo

Senior Electrical Commissioning Engineer - Data Center Construction

FST Technical Services
Los Angeles, CA Full Time
POSTED ON 7/29/2026
AVAILABLE BEFORE 10/26/2026

Lead the Systems That Power Critical Infrastructure 

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution. 
 
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments. 

Why This Role Stands Out 

This is not a checklist-driven commissioning role. 
 
This is a position for someone who: 
• Owns outcomes, not just tasks 
• Understands systems holistically, not in silos 
• Can operate independently while leading others 
 
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions. 

What You’ll Do 

Project Leadership & Execution 
• Lead commissioning activities across the full project lifecycle 
• Execute and oversee functional testing, factory witness testing, and on-site validation 
• Manage multiple assignments while maintaining schedule, budget, and quality expectations 
• Interpret contract documents to identify risks and opportunities 
 
Technical Expertise & Problem Solving 
• Evaluate electrical distribution systems and building system interconnectivity 
• Troubleshoot system performance issues in real time 
• Review design documentation and submittals 
 
Client & Stakeholder Engagement 
• Lead commissioning meetings and communicate findings 
• Serve as a trusted partner to clients and contractors 
 
Operational Contributions 
• Complete field reports, documentation, and time management 
• Support scheduling and revenue targets 
 
Team Development 
• Mentor junior engineers and support training initiatives 

What You Bring 

Core Qualifications 
• Electrical Engineering degree or Qualified Electrician background 
• 7 years in electrical systems OR 3 years commissioning 
• Data center or mission-critical experience 
 
Technical Capabilities 
• Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation 
• Ability to read construction drawings and specifications 
 
Professional Skills 
• Strong analytical and communication skills 
• Ability to lead meetings and manage multiple priorities 
 
Physical Requirements 
• Ability to work in field environments, climb ladders, and lift ~30 lbs 
 
Preferred 
• EIT, CEM, LEED, OSHA 30, BIM experience 

Travel Requirements 

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required. 

Why FST 

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles

Salary range: $130,000 to $180,000

Salary : $130,000 - $180,000

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Senior Electrical Commissioning Engineer - Data Center Construction?

Sign up to receive alerts about other jobs on the Senior Electrical Commissioning Engineer - Data Center Construction career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$110,220 - $132,692
Income Estimation: 
$151,084 - $181,738
Income Estimation: 
$133,507 - $160,824
Income Estimation: 
$136,663 - $175,160
Income Estimation: 
$157,953 - $182,694
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at FST Technical Services

  • FST Technical Services York, PA
  • FST Technical services commissioning (Cx) division is one of the leading Cx firms in the country. We partner with clients for quality assurance in the desi... more
  • 2 Days Ago

  • FST Technical Services Washington, DC
  • We’re excited to connect with candidates in Washington DC; however, this role is based in Atlanta, GA or San Jose, CA. The position offers opportunities fo... more
  • 3 Days Ago

  • FST Technical Services Seattle, WA
  • We’re excited to connect with candidates in Seattle, WA; however, this role is based in Atlanta, GA or San Jose, CA. The position offers opportunities for ... more
  • 3 Days Ago

  • FST Technical Services Dallas, TX
  • We’re excited to connect with candidates in Dallas; however, this role is based in Atlanta, GA or San Jose, CA. The position offers opportunities for trave... more
  • 4 Days Ago


Not the job you're looking for? Here are some other Senior Electrical Commissioning Engineer - Data Center Construction jobs in the Los Angeles, CA area that may be a better fit.

  • Glumac - A Tetra Tech Company Los Angeles, CA
  • A leading engineering firm is seeking a Commissioning Authority to join its Data Center Commissioning Team.This hybrid role in California focuses on managi... more
  • 30 Days Ago

  • Los Angeles - Tetra Tech Careers Los Angeles, CA
  • The Opportunity: Glumac, a Tetra Tech company, is seeking an Electrical Commissioning Authority to join our world-class Data Center Commissioning Team. Thi... more
  • 2 Months Ago

AI Assistant is available now!

Feel free to start your new journey!