Demo

Physical Design Engineer - Flow & Methodologies

Change Order
San Jose, CA Full Time
POSTED ON 7/24/2026
AVAILABLE BEFORE 8/22/2026
Etched

Design

San Jose, CA, USA

Posted on Jul 23, 2026

About Etched

Etched is building hardware for frontier intelligence. We co-design chips, racks, software, and manufacturing to deliver best-in-class throughput and latency across both prefill and decode workloads. Our first products are heavily focused on inference. Backed by hundreds of millions from top-tier investors and staffed by leading engineers, Etched is redefining the infrastructure layer for the fastest growing industry in history.

Job Summary

Etched is building a new category of AI hardware: frontier inference clusters. As a Physical Design Methodology Engineer, you will architect our PD flow from first principles. You will own the infrastructure that allows our design team to iterate at unprecedented speeds, directly accelerating our time-to-market and enabling PPA gains that aren't possible with off-the-shelf CAD methodologies.

Key Responsibilities

  • Architect, build, and maintain our automated RTL-to-GDSII flow, from synthesis through place and route to signoff handoff.
  • Automate PD flows end to end, including regression running, run management, and release and version control of flow configurations.
  • Build and own the CAD infrastructure supporting PD, including tool version qualification and deployment, and efficient use of compute and licenses.
  • Drive dashboards that show the convergence of projects related to PD, including timing, physical verification, and utilization trends.
  • Optimize tool flows and work with EDA vendors to evaluate and incorporate the latest features.
  • Define reference flows, QoR targets, and delivery checklists for 3rd party physical design services, and audit deliveries against them.
  • Partner with block and top-level owners to debug flow issues and encode fixes into the methodology rather than one-off patches.
  • Create block level and full chip level PG mesh from scratch using design rule documents, design requirements, and EM/IR feedback.
  • Create and maintain a DRC-clean floorplanning flow and enable floorplan signoff checks.
  • Drive PPA tuning to optimize tool settings for best power, performance, and area outcomes.
  • Establish and maintain timing correlation from pre-route through post-route and between implementation and signoff tools.

You may be a good fit if you have

  • 5-10 years of previous experience with PD or PD methodology/CAD
  • Experience building and owning automated RTL-to-GDSII flows used by multiple block owners
  • Experience creating block level and full chip level PG mesh from scratch, including interpretation of design rule documents and EM/IR analysis
  • Experience with DRC-clean floorplanning flows and automated checks
  • Experience with Cadence (Innovus, Genus) or Synopsys ( Fusion Compiler) automated RTL-to-GDSII flows
  • Experience with PPA tuning and timing correlation across pre-route, post-route, and signoff environments
  • Experience integrating sign-off tools (PrimeTime, Tempus, Voltus, Pegasus, Calibre) into production flows
  • Experience with back-end design on advanced process nodes (5nm and below)
  • Experience with UPF-based low power design methodology and multi-mode multi-corner setup
  • Strong Tcl and Python skills for flow development and automation
  • Deeply creative and able to think from first principles

Strong Candidates May Also Have Experience With

  • Familiarity with modern ML and LLM model architectures
  • Familiarity with AI tools for programming/coding
  • Experience with compute farm and job scheduler optimization for EDA workloads
  • Startup experience or comfort working in fast-paced environments

Benefits

  • Medical, dental, and vision packages with generous premium coverage
    • $500 per month credit for waiving medical benefits
  • Housing subsidy of $2k per month for those living within walking distance of the office
  • Relocation support for those moving to San Jose (Santana Row)
  • Various wellness benefits covering fitness, mental health, and more
  • Daily lunch and dinner in our office
  • Unlimited compute budget subject to ROI justification
How We’re Different

Etched believes in the Bitter Lesson. We are the first inference-focused frontier AI system, betting early on transformer and transformer-like architectures and on increasing model sizes. Our addressable market is the entirety of inference, unlike many of our competitors.

We are a fully in-person team in San Jose (Santana Row), and greatly value engineering skills. We do not have boundaries between engineering and research, and we expect all of our technical staff to contribute to both and work across disciplines as needed.

See more open positions at Etched

Salary : $500 - $2,000

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Physical Design Engineer - Flow & Methodologies?

Sign up to receive alerts about other jobs on the Physical Design Engineer - Flow & Methodologies career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$104,754 - $125,215
Income Estimation: 
$134,206 - $155,125
Income Estimation: 
$134,206 - $155,125
Income Estimation: 
$171,024 - $193,943
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Change Order

  • Change Order Scottsdale, AZ
  • Vestwell is the financial technology company powering the new savings economy. Our platform redefines how people save for the critical aspects of life acro... more
  • 1 Day Ago

  • Change Order York, NY
  • Pinwheel IT, Sales & Business Development New York, NY, USA USD 144k-156k / year Equity Posted on Jul 22, 2026 Pinwheel - Building the future of financial ... more
  • 1 Day Ago

  • Change Order York, NY
  • Vestwell is the financial technology company powering the new savings economy. Our platform redefines how people save for the critical aspects of life acro... more
  • 1 Day Ago

  • Change Order Austin, TX
  • Vestwell is the financial technology company powering the new savings economy. Our platform redefines how people save for the critical aspects of life acro... more
  • 1 Day Ago


Not the job you're looking for? Here are some other Physical Design Engineer - Flow & Methodologies jobs in the San Jose, CA area that may be a better fit.

  • Tenstorrent Santa Clara, CA
  • Tenstorrent is leading the industry on cutting-edge AI technology, revolutionizing performance expectations, ease of use, and cost efficiency. With AI rede... more
  • 2 Days Ago

  • Flow San Jose, CA
  • About The Company At Flow, we’re reimagining what it means to live, work, and connect. More than just a real estate company, Flow is a brand, a technology ... more
  • 14 Days Ago

AI Assistant is available now!

Feel free to start your new journey!