Demo

Construction Scheduler

Actalent
Lebanon, TN Full Time
POSTED ON 9/26/2026
AVAILABLE BEFORE 10/26/2026
Job Title: Construction SchedulerJob Description

The Construction Scheduler develops and manages detailed Critical Path Method (CPM) schedules for heavy civil construction projects, including Alternative Delivery and traditional Design-Bid-Build work. This role supports preconstruction and active projects by creating, updating, and analyzing schedules, coordinating with multidisciplinary teams, and ensuring alignment with contract, owner, and regulatory requirements. The Construction Scheduler plays a key role in identifying schedule risks, recommending corrective actions, and providing clear schedule reporting to project stakeholders.

Responsibilities
  • Develop detailed CPM schedules for Alternative Delivery projects such as Design-Build, Progressive Design-Build, CM/GC, as well as traditional Design-Bid-Build projects.
  • Support preconstruction and pursuit efforts by creating conceptual, proposal, and baseline schedules that accurately reflect project scope and strategy.
  • Coordinate scheduling activities with project teams, design partners, subcontractors, and field personnel to ensure alignment and accuracy.
  • Maintain and update project schedules regularly, identifying risks, variances, and potential delays, and recommend corrective actions to keep projects on track.
  • Incorporate design revisions, utility coordination, permitting requirements, environmental constraints, and other project changes into schedule updates.
  • Prepare clear and comprehensive schedule narratives, milestone reports, dashboards, resource plans, and executive summaries for internal and external stakeholders.
  • Manage and coordinate equipment, staffing, and production schedules across multiple projects to optimize resources and productivity.
  • Perform Time Impact Analyses (TIA) and schedule evaluations to support change orders, delay analyses, and contract modifications.
  • Sequence major construction activities, including earthwork and mass grading, rock excavation and embankments, utility installation, bridge construction, and asphalt paving and roadway surfacing.
  • Develop traffic control and project phasing schedules that align with owner requirements and regulatory standards.
  • Provide guidance and training to project teams on CPM scheduling practices and effective utilization of Primavera P6.
  • Ensure all schedules comply with owner requirements, contract specifications, and organizational scheduling standards.
  • Participate in owner meetings, design coordination sessions, and project planning workshops to present schedules and support collaborative planning.
  • Support project controls and reporting efforts by integrating schedule data with other project information as needed.
Essential Skills
  • Ability to work full-time in an office environment with occasional visits to project sites.
  • Strong understanding of heavy civil construction methods, including earthwork, mass grading, and excavation.
  • Knowledge of water, sewer, and storm utility installation methods and sequencing.
  • Understanding of bridge foundations and structures and their integration into overall project schedules.
  • Experience with asphalt paving and roadway construction sequencing and constraints.
  • Knowledge of traffic control planning and phasing for roadway and infrastructure projects.
  • Experience supporting both Alternative Delivery and traditional Design-Bid-Build projects.
  • Advanced proficiency in Primavera P6, including logic development, resource loading, and critical path analysis.
  • Knowledge of Department of Transportation (DOT) and Federal Highway Administration (FHWA) standards, milestones, compliance requirements, and incentive/disincentive structures.
  • Ability to read and interpret civil construction plans, profiles, cross-sections, maintenance of traffic plans, and geotechnical reports.
  • Strong analytical skills with the ability to identify schedule risks, impacts, and mitigation strategies.
  • Strong verbal and written communication skills for presenting schedule information to diverse stakeholders.
  • Strong organizational skills with the ability to manage multiple project schedules and priorities simultaneously.
  • Proficiency with Microsoft Office Suite, including Excel, Word, and PowerPoint.
  • 3–5 years of CPM scheduling experience in heavy civil construction.
Additional Skills & Qualifications
  • Bachelor's degree in Construction Management, Civil Engineering, or a related field is preferred; equivalent industry experience will be considered.
  • Experience supporting transportation, infrastructure, roadway, bridge, or utility projects is preferred.
  • Experience with Alternative Delivery project methods, such as Design-Build, Progressive Design-Build, or CM/GC, is strongly preferred.
  • Experience preparing Time Impact Analyses, delay analyses, or claims support documentation is a plus.
  • Experience with project controls tools, collaborative design platforms, or model-based scheduling tools is a plus.
Work Environment

This role is primarily office-based, with the expectation of working full-time in a professional office environment and making occasional visits to active project sites. The position involves regular use of scheduling and productivity tools such as Primavera P6 and Microsoft Office applications, along with potential use of project controls and collaborative design platforms. The work environment includes frequent collaboration with project managers, engineers, designers, subcontractors, and field personnel, as well as participation in meetings with owners and regulatory stakeholders. Site visits may involve exposure to typical heavy civil construction conditions, including outdoor environments, active equipment, and varying weather, while the office setting provides a structured, technology-driven environment focused on planning, coordination, and analysis.

Job Type & Location

This is a Permanent position based out of Lebanon, TN.

Pay and Benefits

The pay range for this position is $68000.00 - $85000.00/yr.

full time benefits, paid pto and holiday

Workplace Type

This is a fully onsite position in Lebanon,TN.

Application Deadline

This position is anticipated to close on Aug 7, 2026.

About Actalent

Actalent is a global leader in engineering and sciences services and talent solutions. We help visionary companies advance their engineering and science initiatives through access to specialized experts who drive scale, innovation and speed to market. With a network of almost 20,000 consultants and 5,000 clients across the U.S., Canada, Asia and Europe, Actalent serves many of the Fortune 500. We are proud to be an Engineering News-Record (ENR) Top 500 Design Firm for our engineering design services and a ClearlyRated Best of Staffing® winner for both client and talent service.

The company is an equal opportunity employer and will consider all applications without regard to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law.

If you would like to request a reasonable accommodation, such as the modification or adjustment of the job application process or interviewing process due to a disability, please email actalentaccommodation@actalentservices.com for other accommodation options.

San Francisco Fair Chance Ordinance: Pursuant to the San Francisco Fair Chance Ordinance, for all positions located in the city and county of San Francisco, we will consider for employment qualified applicants with arrest and conviction records.

Massachusetts Lie Detector: It is unlawful in Massachusetts to require or administer a lie detector test as a condition of employment or continued employment. An employer who violates this law shall be subject to criminal penalties and civil liability.

Use of Artificial Intelligence (AI): We may use Artificial Intelligence (AI) to support parts of our hiring process, including sourcing, screening, and evaluating candidates. AI helps assess applications and qualifications, but final decisions are made by our hiring team. By applying, you acknowledge and agree that your application may be reviewed using AI tools.

Salary : $68,000 - $85,000

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Construction Scheduler?

Sign up to receive alerts about other jobs on the Construction Scheduler career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$65,079 - $82,270
Income Estimation: 
$88,573 - $114,377
Income Estimation: 
$102,413 - $133,130
Income Estimation: 
$91,640 - $116,747
Income Estimation: 
$119,541 - $162,386
Income Estimation: 
$103,110 - $134,766
Income Estimation: 
$95,422 - $120,607
Income Estimation: 
$137,303 - $192,299
Employees: Get a Salary Increase
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at Actalent

  • Actalent Dakota, SD
  • Job Title: Manufacturing Engineer Job Description We are looking for a proactive and detail-oriented Manufacturing Engineer to lead and support daily opera... more
  • 7 Days Ago

  • Actalent Dakota, SD
  • Job Title: Manufacturing Engineer Job Description We are looking for a proactive and detail-oriented Manufacturing Engineer to lead and support daily opera... more
  • 7 Days Ago

  • Actalent Greenwich, RI
  • Job Title: Construction Superintendent Job Description The Construction Superintendent provides day-to-day field leadership and supervision of commercial c... more
  • 7 Days Ago

  • Actalent WARWICK, RI
  • Job Title: Field Service Technician Job Description The Field Service Technician installs, maintains, and repairs tolling and intelligent transportation sy... more
  • 7 Days Ago


Not the job you're looking for? Here are some other Construction Scheduler jobs in the Lebanon, TN area that may be a better fit.

  • JE Dunn Construction Nashville, TN
  • Best People Right Culture. These are the driving forces behind JE Dunn’s success. By hiring inspired people, giving them interesting and challenging work, ... more
  • 7 Days Ago

  • Actalent Nashville, TN
  • Job Title: Construction Scheduler Job Description The Construction Scheduler develops and manages detailed Critical Path Method (CPM) schedules for heavy c... more
  • 27 Days Ago

AI Assistant is available now!

Feel free to start your new journey!